Norah's Vintage Afghan
In progress
Progress
90%
January 19, 2024
work in progress

Norah's Vintage Afghan

Project info
Norah's Vintage Afghan by Norah Gaughan
Knitting
BlanketBedspread
Me
Craftyreader2 on ravelry
December 24, 2025
Aussie double
Needles & yarn
US 7 - 4.5 mm
4.5 mm
4,920 yards
Fiber Lily D'luxe DK
50 yards in stash
0.78 skeins = 178.6 yards (163.3 meters), 78 grams
Make-Along Club Seascape DK
Green
FiberLily.com
December 28, 2023
Fiber Lily D'luxe DK
37 yards in stash
0.84 skeins = 192.4 yards (175.9 meters), 84 grams
Make-Along Club 2024 Seascape DK
Fiber Lily
December 28, 2023
Fiber Lily D'luxe DK
18 yards in stash
0.92 skeins = 210.3 yards (192.3 meters), 92 grams
Make-Along Club 2024 Seascape DK
FiberLily.com
December 28, 2023
Fiber Lily D'luxe DK
none left in stash
1 skein = 229.0 yards (209.4 meters), 100 grams
FiberLily.com
March 14, 2024
Fiber Lily D'luxe DK
69 yards in stash
1.7 skeins = 389.3 yards (356.0 meters), 170 grams
Fiber Lily
March 14, 2024
Fiber Lily D'luxe DK
none left in stash
1.73 skeins = 396.2 yards (362.3 meters), 173 grams
Green
FiberLily.com
March 14, 2024
Fiber Lily D'luxe DK
92 yards in stash
1.6 skeins = 366.4 yards (335.0 meters), 160 grams
Blue
Fiber Lily
March 14, 2024
Fiber Lily D'luxe DK
none left in stash
1.79 skeins = 409.9 yards (374.8 meters), 179 grams
Gray
FiberLily.com
March 14, 2024
Fiber Lily D'luxe DK
96 yards in stash
1.58 skeins = 361.8 yards (330.8 meters), 158 grams
Green
Fiber Lily
March 14, 2024
Fiber Lily D'luxe DK
39 yards in stash
1.83 skeins = 419.1 yards (383.2 meters), 183 grams
Blue-purple
FiberLily.com
June 3, 2024
Fiber Lily D'luxe DK
none left in stash
3 skeins = 687.0 yards (628.2 meters), 300 grams
FiberLily.com
June 17, 2024
Fiber Lily D'luxe DK
7 yards in stash
1 skein = 229.0 yards (209.4 meters), 100 grams
Gray
FiberLily.com
July 15, 2024
Fiber Lily D'luxe DK
none left in stash
1 skein = 229.0 yards (209.4 meters), 100 grams
Green
FiberLily.com
November 2, 2024
Fiber Lily D'luxe DK
229 yards in stash
2 skeins = 458.0 yards (418.8 meters), 200 grams
FiberLily.com
November 23, 2024
Fiber Lily Lush DK
68 yards in stash
0.75 skeins = 164.0 yards (150.0 meters), 75 grams
Green
Fiberlily.com.au
February 22, 2020
Notes

Fiber Lily MAL 2024. A good project for knit group and tea breaks. Have received 1st skein in the Seascape colourway Blanket Club, January is an olive green (weighs 104 gms), will swatch tonight if the temperature drops - needle same as pattern 4.5 mm?

20-01-2024

Trying square 1 as Cable without a cable needle pinch technique, tension seems to be OK.
At 1/2 way point of square 1, this one will take about 70 gms.

24-01-2024

Cast off square 1, waiting for next yarn Club installment

13-02-2024

Cast on Square 2, cast off on 19 Feb. Ordered an extra Topaz and Tide with 2nd quarter (doubled). Order Delta and Halo if a lighter colourway and bluer required. Cast on square 4 in Cove Lush DK from stash, will knit March MAL colour as square 5, and April as squares 3 and 8.

27-03-2024

Nearing half way point of square 5, blocking square 4, coming out larger in Lush DK.

** Had difficulty with cast on set up of square 5 as instructions incorrect they have been copied from another square, the increase ratio is way out to get required stitch count, ended ripping back and doing k1, m1 3 and 4 times each end, rather than play with k2, m1 repeat in the middle of increase row. The square is also bigger, will have to pull back edging of square 1 before sewing up, and add a part wiggle (guage on 1st possibly a lot tighter using no cable needle).

Will keep checking gauge of the more dense squares against less crossing patterned squares.
March colourway most likely Alexandrite, as fatigue has set in will do 2 squares with lighter colourways next.

16-04-2024

Caked up Topaz for square 3, Riverstone for square 9, add April colourway for square 8. If May colourway is a deeper Cove teal it will be square 7.

Cast off Square 3 on 20th April, and cast on Square 9 in Riverstone (pale grey).

25-04-2024

Finishing up square 8 at the end of April, will cake up the Tide skein for square 10, so I will ready to knit square 7 in the May MAL colourway in 3rd week of May, will decide on using 2nd skein of April colourway for knitting in June after the May skeins arrive.

05-05-2024

Started square 7 in Tide colourway, I expect the May MAL colourway to arrive at the end of next week, and if it is the deeper steel blue I expect from the website pic, that will be square 10, and the other deep olive may be square 12, and I may start stitching them together, as a partial lap blanket.

09-06-2024

Having knit half the squares, and thinking about an edging, I came across Frankie Brown’s Ten stitch cable blanket. I think using the leftovers assembled into a gradient once I have all the colours, possibly with a skein of co-ordinating semi solid, would make a great border and extend the size a little more, as though superwash and therefore stretchy when wet, my blocks are a little small.

Castoff square 6 on 21st June using 83 gms, and then cast on square 12.
Square 12 cast off 28th June but not blocked.

29-06-2024

Sewn in square 6. Cast on square 17 on the 4th July in Delta.

09-07-2024

Square 17 cast off 9th July

15-07-2024

Popped latest 2 squares in to block, I am expecting the next skein from Fiber Lily by the end of the week.

Square 15 cast on the 23rd of July and cast off on 28th, with 24.5 gms left.

17-09-2024

Started square 11 in the MAL September colourway. Cast off 24th, sewn into blanket on 26th September.

October colourway most likely for square 18, and Sept for square 14.

20-10-2024

Having issues with square 20, will be ripping back the same 10 rows again. Too tired and I want it to be done.

24-11-2024

Stalled on square 20, with last 3 squares yet to be started. Think the virus I caught after struggling with hayfever was Covid. Keep making mistakes and very tired, have set aside square 20. Ordered wrong weight of colourway for final quarter ….
Getting a shawl off the needles, so will cake up another skein and start another square on new cord, will come back to 20 and frog back a portion again for the 4th time. I will not make my January 2025 deadline for this project, but will be finished well before 21 months.

28-11-2024

Square 20 finished with 46.57 gm of Riverstone left for the border. Square 19 started with Alexandrite, waiting for next order for dyed to order last quarter set, 2 of the lighter (not Olive) to knit the last 2 squares.
Blocked square 19 on 7th Dec. 22.7 gms left of the Alexandrite.

31-12-2024

Started 2nd last square. October MAL colourway, square 18.

02-01-2025

Will finish knitting square 19 today, and cast on the last square (no. 14), in November MAL colourway.

12-01-2025

Finished last square, 74.5 gms used, leaving 24.8 grms.

viewed 30 times
In progress
Progress
90%
January 19, 2024
work in progress
About this pattern
1019 projects, in 1280 queues
Craftyreader2's overall rating
Craftyreader2's clarity rating
Craftyreader2's difficulty rating
About this yarn
by Fiber Lily
DK
100% Merino
219 yards / 100 grams

97 projects

stashed 89 times

Craftyreader2's star rating
About this yarn
by Fiber Lily
DK
100% Merino
229 yards / 100 grams

77 projects

stashed 126 times

Craftyreader2's star rating
  • Originally queued: December 28, 2023
  • Project created: December 28, 2023
  • In progress: December 28, 2023
  • Updated: August 19, 2025
  • Progress updates: 21 updates