Notes

Bottom-up construction. 2 skeins size 5? Or D with extra bust adjustments. Caked up the 1st ball for swatching. I ended up using less than 2 skeins, as I went fitted and cropped, leaving the 3rd skein for another project.

I will be adding extra stitches to my cast on, as full bust is more size E than D, will be adding bust dart shortrows size 3, to the larger stitch count equivalent, as my yarn is closer to sportweight, giving more length at front.

28-01-2025

Having started a swatch, I decided that I would prefer the lace was mirrored either side of the centre stitch rather than repeated.

03-02-2025

Blocking swatch, ribbing and 30 rows lace - 17cm wide and 10.5 cm deep.
I will be casting on 294 stitches for hem (between D and E sizes).

14-02-2025

Finished 1st repeat of lace on body, stitches reduced to xx after the ribbing, more decreases on back than on the front. Have moved BOR and side markers 5 stitches to the back, so I have more stitches on the front when splitting for armscye.

22-02-2025

Body 11.5 cm, so starting gentle increases on side seams for fuller bust.

24-02-2025

2nd skein joined on. Still increasing every 4th row 2 stitches near each side seam marker.

26-02-2025

Started bust darts. And finished bust darts for cup size 4, 9 pairs of short rows at 30cm in length, ready for decreases, for armhole separation.

27-02-2025

Split the lace panel on front for v-neck, while also decreasing my extra bust stitches and slow armscye decreases at the same time.
Have worked 4 inches after the split - 28th Feb.

02-03-2025

Split for neck on back. About to do short row shoulder shaping of 1st side at 11.25 cm, from splitting. Completed short row shaping 2nd shoulder late on the evening of the 3rd February

04-03-2025

Three needle bound off my 2 shoulder seams. Picked up stitches for neckline icord on the larger needle.

06-03-2025

Picking up stitches for 2nd armhole ribbing. Cast off with alternating cast off method.

viewed 38 times
Finished
January 27, 2025
March 9, 2025
About this pattern
281 projects, in 728 queues
Craftyreader2's overall rating
Craftyreader2's clarity rating
Craftyreader2's difficulty rating
  • Originally queued: June 30, 2024
  • Project created: January 24, 2025
  • Finished: March 8, 2025
  • Updated: March 10, 2025
  • Progress updates: 11 updates