Tempo Sweater
Finished
September 1, 2025
October 20, 2025

Tempo Sweater

Project info
Tempo Sweater by Zanete Knits
Knitting
SweaterPullover
Me
Craftyreader2 on ravelry
120 cm
Needles & yarn
US 6 - 4.0 mm
US 7 - 4.5 mm
24 stitches and 32 rows = 4 inches
in 1x3 Twisted Rib on larger needles, blocked.
3,546 yards
Fiber Lily Super Soft Sock
none left in stash
2.85 skeins = 1215.6 yards (1111.5 meters), 285 grams
Purple
FibreLily.com
November 2, 2024
ITO Sensai
12 yards in stash
8.88 skeins = 2330.7 yards (2131.2 meters), 177 grams
D241Y65670
Thread Collective
October 14, 2024
Notes

Work in fingering 4ply with mohair for sportweight guage.

September 1, 2025

Cast 30 stitches to follow the instructions for back (as a swatch), adding 2nd strand of mohair on row following cast on. Using 4mm needle on back until sleeve join, and 4.5 mm for the front and rest of body.

After knitting 7.5 cm and getting to 60 stitches, width is 11 cm at cast on and 23 cm active row. Giving it a soak for guage. I am happy with the fabric. I like the fabric at 24.5 stitches and 32 rows guage, so will continue on this needle for the 1st section on back.

September 4, 2025

Blocked guage - 24 stitches and 32 rows, width grew 13% and depth shrunk about the same, so remember when measuring unblocked seams.
It should take 43 rows to reach straight section of back at this guage.

September 6, 2025

Continuing straight, with 99 stitches on the needle, for 10 rows then start underarm shaping for armscye depth.
Added 5 increases as per pattern.
Picked up 38 stitches and decreased to 29 stitches for shoulder shaping (3 stitches more than my size).

Worked 18 rows of right shoulder, and place stitches on hold.

September 7, 2025

After matching left should to the right, I began adding increases to the neck edge. 1 stitch added every 4 rows for total of 6 increases, now only increasing at sleeve edge at half the rate.

September 10, 2025

Completed the front to 23.5 cm and broke the yarn, rejoined on the back, to continue another 4.5 cm of length on 4.5 mm needle.

Joined at underarms.

September 13, 2025

Finished the 1st 40 gms of mohair after joining under the armholes

September 14, 2025

Started horizontal bust darts 5cm below armhole join, and worked 10 pair.

September 18, 2025

Underarm length is now 14 cm, and I have done 5 cm of shaping (decreases) to reduce ease added for my bust, but adding stitches at ends for centre join.

Joined the 2nd skein of Fiber Lily sock, and knit a few more rows increases at the ends and decreases at side seams.

September 19, 2025

My second order of mohair (from the same yarn store) has matching dyelot, so I will work another 7 cm of body, then switch to the sleeves with new mohair balls.

September 21, 2025

Joined in the round after casting on the 16 stitches.
Knit 7 cm of the body in the round .

September 23, 2025

Put the body on hold, cut yarn and joined to underarm to pick up sleeves stitches, ignoring the instructions regarding pickup rate and decrease in the next round. I pick up 1 stitch in each stitch, and only decreased 6 stitches, 2 stitches either side of bor marker, and 2 stitches near corners at top of shoulder.

Followed larger size for 1st part of shortrows, but after completing 1st section, went 1 stitch after turn (for each side) rather than the instructed 2 stitches past.

24th September
Too hot to work on sleeves today as it is 29C. Worked on a new cast on shawl instead.

October 4, 2025

Down to just above the elbow on 1 sleeve, the other 7cm below the underarm join.

Will start increasing the taper. Knit to 18cm (elbow), and had enough of small circumference knitting and rejoined to the body.

October 7, 2025

Joining in another ball of mohair and soon another, both sleeves now under the elbow in length.

Last of 2nd skein of Fiber Lily used on sleeve (just before change to cuff). I will break off and join at elbow of the other sleeve with 3rd skein.

October 11, 2025

After matching the 2nd sleeve, I have put stitches on hold. 96.8 grams of the Fiber Lily left and 55 gms of Ito Sensai.

Neckline stitches picked up, and knit on a 3.75 mm needle.

October 12, 2025

Added 2 decreases in ribbing close to shoulder seam, to narrow the v-neck shaping.

Cast-off with alternating bind off. As I only used 9 gms of the sock yarn on the neckline, I have decided to add a shallow scoop to the back hemline, when I add length, starting at the hip bone,

October 15, 2025

Finished the 7th ball of mohair, only half the hem ribbing done, so I am going to have to use the 9th ball purchased for another project.

October 17, 2025

Cast off ribbing on the left sleeve. Glad I made it full length with minimal taper from the elbow to wrist.

viewed 26 times
Finished
September 1, 2025
October 20, 2025
 
About this pattern
30 projects, in 136 queues
Craftyreader2's overall rating
Craftyreader2's clarity rating
Craftyreader2's difficulty rating
About this yarn
by ITO
Lace
60% Mohair, 40% Silk
262 yards / 20 grams

12285 projects

stashed 8333 times

Craftyreader2's star rating
About this yarn
by Fiber Lily
Fingering
75% Merino, 25% Nylon
427 yards / 100 grams

699 projects

stashed 1050 times

Craftyreader2's star rating
  • Originally queued: October 13, 2024
  • Project created: July 6, 2025
  • Updated: October 21, 2025
  • Progress updates: 15 updates