Rosy Rose
Finished
July 26, 2026
August 14, 2026

Rosy Rose

Project info
212-10 Copper Rose by DROPS design
Knitting
TopsTee
Me and Fun
M
Needles & yarn
US 2 - 2.75 mm
US 4 - 3.5 mm
US 7 - 4.5 mm
Garnstudio DROPS Safran
4.5 skeins = 787.4 yards (720.0 meters), 225 grams
Pink
Notes

Not sure if I will knit on this a lot when it is really hot - but I will cast it on so that is done and I COULD if I felt like it…

July 26, 2026

Started with 2.75 mm needles, ribbing for 8 rounds.
Increased to 156 stitches and changed to 3.5 mm.
Plan to do the yoke with 3.5 mm needles and then change to bigger needles for the rest of the body.
Will only do 3 bobbles, will leave the one in the first round out.
M1L at beginning of chart
M1R at the end

Finished all bobble. Looked up my blog post from some years ago where I talked about knitting backwards »
This tutorial on knittinghelp.com » is very helpfull for the bobbles, I did not have to turn my work.

For the increases in the last bobble row, I did the yarnover increases as the pattern suggests and knitted them through the back loop in the next row so I would not get holes.

Not totally sure about the pink color - it has a slight greyish touch which I am not sure I like.
Now that the bobbles are done, it is just lace, so should be smooth sailing for the rest of the yoke

July 27, 2026

Oh, overread that there is another bobble at the very last round of the yoke - ok, well, but it will take some time until I get there…
Aiming to do two rounds minimum a day, one pattern round, one plain round.

July 31, 2026

Finished 4th increase row, now there only two eyelets per pattern repeat.

August 1, 2026

Finished yoke pattern, switched to 4.5 mm needles after the last increases, now on to the raglan increases for the rest of the yoke.

Ran out of the 1st ball of yarn in the row when I switched to bigger needles.

Will do yarnover increases here as I am supposed to increase every 2nd row, and it is easier to remember with yarnover increases, I think.

Reached 5th of 10 increases by the end of the day.

August 2, 2026

After 10 increases, my yoke is only at app. 18 cm, so I will have to knit another 6 rounds from here on to reach 20 cm depth.

August 3, 2026

Moved sleeve stitches to barber cord - has anybody else the problem that the cord slips of the working needle? Very anoying! I might switch back to was yarn next time … grmpf

Casted on 10 instead of 8 stitches under arm.

August 5, 2026

Finished second ball of yarn app. 8 rounds after separating sleeves.

August 8, 2026

Ran out of 2nd ball of yarn 15 cm after sleeve separation

August 9, 2026

Reached 40 cm total length, app. 21 cm after sleeve separation.

August 10, 2026

Started ribbing, reached app. 43 cm total length

August 13, 2026

Finished body with about 10 meters of the 4th ball left.
Picked up 84 stitches for the arm
Knitt 35 rounds before decreasing to 66 stitches
Then 8 rounds in 1 by 1 ribbing before casting off.

August 14, 2026

Finished! Used app. 4.5 balls for what looks to be quite roomy for a size M as I used quite big needles. Photo is taken before blocking.

August 15, 2026

Took in-wear photos and I really like it! Fit and length is exactly like I wanted it to be. Only the slightly greyish tint of this colorway is not ideal, but all in all I would call this a success!

viewed 91 times | helped 1 person
Finished
July 26, 2026
August 14, 2026
 
About this pattern
57 projects, in 134 queues
Domic's overall rating
Domic's clarity rating
Domic's difficulty rating
About this yarn
by Garnstudio
Sport
100% Egyptian
175 yards / 50 grams

26245 projects

stashed 23593 times

Domic's star rating
  • Project created: July 26, 2026
  • Finished: August 14, 2026
  • Updated: August 15, 2026
  • Progress updates: 6 updates