Decided that I need a light cotton sweater and so I got the cotton yarn when it was on sale at Aldi Süd.
As to the ballband, this is supposed to be knitted up to 22 stitches to 4 inches, when working with fingering sockyarn, I will have around 24 stitches.
So I guess I will knit L to get M measurements.
Will only start the striping after working the short rows for the back all in pink.
March 13, 2026
Well, I might try to get another 4-ball-pack at Aldi tomorrow. If they do not have anything left, I might add in a bit from my cream/natural sockyarn stash for the sleeves or so - we will see. Or I also have some Drops Safran left which I could use.
March 14, 2026
Did not do stripes for short row section, but just plain pink.
Reached 21 cm after first 2.5 Stripes
Added in the orange yarn as I want to save pink for the front
Yeah, luckily I could get another 2 balls each of pink and apricot, so no more saving!
Finished back, picked up with a 2.5 mm needle for the front, knitted the stitches on the 3.5 mm after picking up.
March 15, 2026
Joined into the round
Cast in 4 stitches each under the underarm
March 16, 2026
Added 3 yellow stripes, ran out of 2nd pink ball in 4th stripe after joining for the round.
March 17, 2026
Finished 4th pink stripe, started 4th yellow stripe.
March 20, 2026
Started 5th yellow stripe after joining into the round
March 23, 2026
Working on 3d stripe in apricot
March 29, 2026
Finished body and neck - did neck first to make sure I have enough of the pink yarn as this is my last ball.
Have 18 g left for the sleeves, picked up only 68 stitches for sleeve, increased to 84 stitches in the second row.
Used only about 1.5 g of yarn for the first pink stripe, so I will probably be able to do about 3 pink stripes before substituting pink with apricot.
April 2, 2026
Finished first sleeve
Did 13 of the lighter Stripes
Then 4rounds in Apricot
Decreased to 60 stitches
6 rounds ribbing
2 rounds in pink incl. Bind-off
Picked up 3 stitches every 4 rows for the second sleeve instead of 2 every 3 rows which turns out to give me the stitch count I am supposed to have. With the first sleeve, I had to increase quite a bit before reaching this amount.
April 3, 2026
Finished knitting.
Have about 5 metres left of the pink yarn, but nearly 2 balls of apricot and about half a ball each of white and yellow.
Did not do the Italian bind of for sleeves and body, and though I did the doubled neck, I am not sure I like it in this thick yarn.
Will probably knit it again in fingering.