All done with the collar - have some more ends to weave in and then it’s zipper time!!! Made some mistakes picking up wraps on the collar. Also sized up to a size 7 needle for the collar, and didn’t do as many short rows as called for. Then did several more rows before bind off (sewn/Kitchener bind off after two tubular setup rows)- pleased with how the collar falls :)

Seaming! I don’t love how this is lining up but there’s no way around it really. I kind of wish I’d put an additional row or two beyond what the pattern called for here.

All the major pieces are done! On to the facings :)

Back- completed. I’m so tired.

Back of sweater, chart 2 complete. Ladderback definitely a big win here

Chart 1 on the back complete- this is much neater and easier than trying to catch all those floats!
As a note, starting the ladders with a backwards loop send to work out a little better than using a lifted increase

I may have spaced my ladders a little too close together. Either way, SO MUCH easier than what I did for the sleeves. The larger chart will be harder than this section, but I think the result will be so much better :)

First sleeve done. Had some massive confusion about the decrease section, will add to the notes…

I way underestimated how hard the color work would be in flat 1x1 rib. This is the third attempt ultimately I went back to the main needles I am using for the rest of the sweater - the tension does get a little tighter but with bigger needles it was just messy.

photos above
©
Goldentoes
Cliff’s Lebowski sweater
viewed 17 times
Finished
Progress
100%
January 28, 2022
no date set
About this pattern
from Andrea Rangel Knits
Goldentoes' overall rating

About this yarn
by Cascade Yarns ®
Bulky
100% Wool
478 yards
/
250
grams
34925 projects
stashed
14364 times
Goldentoes' star rating
- Project created: January 28, 2022
- Updated: December 25, 2022
- Progress updates: 7 updates