SM20- Round 2 - Pretty Privilege
Finished
March 22, 2026
April 1, 2026

SM20- Round 2 - Pretty Privilege

Project info
Pretty Privilege by Anna Zhuravleva
Knitting
Feet / LegsSocksMid-calf
Medium
Needles & yarn
US 2 - 2.75 mm
Cascade Yarns ® Heritage®
1 skein = 437.0 yards (399.6 meters), 100 grams
03
Blue-green
Yarncom in Creve Coeur, Missouri
March 22, 2026
Notes

No idea where I got this (Berroco Ultra Fine Wool in 53161 Matcha) yarn, but I suspect it was from the closing sale at Myers’ House.

Onward!!

03-22-2026

Changed my mind, decided I needed something with some nylon in it. Heritage sock it is!

03-23-2026 early AM

More changes: I started on this sock, got all the way to the 20th round of the foot, and decided it was too loose and to big. Rrrrip!

Changed from US 2.5 (3mm) to US 2 (2.75mm), and am now making this a size Medium instead of Large.

I’m back up to the end of Round 18 and I like this sizing much better.

This sock will be due at about 8AM on Easter Sunday, which is fine by me. If there’s a few days gap again as there was after Round 1, I will be happy as I am getting the cross-linking done on my left eye on April 6, aka Easter Monday.

03-23-2026

Stopped at work halfway thru Round 6 second repeat.

Stopped for the night at the end of Gusset Round 2/Instep Round 27.

03-25-2026 early AM

Oof. Was 8 rounds into the gusset - and when I got to the end of the round, there was a HUGE HOLE. I’d apparently DROPPED the yo st at some point and it ran all the way back to the point of the gusset. Blergh. Not fixable, so frogged back to the start of the gusset and began again.

This time I put the gusset increases on the same round as the eyelets, so all the hard stuff would be on the same round.

Started Gusset Rounds on Chart A Round 27, so 28 is 2, 29 is 3, 30 is 4, and 3 is 5.

Ended for the evening at the end of Chart A Round 14, which leaves me with 2 more Gusset Increase rounds, should end gusset on Chart A Round 18. I have marked up my PDF with notes for the next sock as well.

03-27-2026 Early AM

Stopped for the evening at the end of Leg Round 11. I did the heel turn yesterday, but fell asleep with my project in my hands!

03-28-2026 early AM

Stopped for the night after 5 rounds of the ribbing. Need sleep before doing super stretchy bind-offs.

03-28-2026 4PM

Sock #1 finished! Onto #2.

03-29-2026 early AM

Stopped for the night at the end of Foot Round 18. Doesn’t seem very far, does it? Well, that’s because I started the second sock at 4:30, got all the way up to where I am now, and realized that the increases in the toe were wonky. As in, around the 18th round of the toe. I did another round of the foot, decided that it was just too noticeable, and ripped it out and started it again.

Weirdly I’m stopping at the same spot I stopped on the FIRST sock, 6 days ago. O_o

03-30-2026 midnight

Stopped for the night at the end of Gusset Round 14.

03-31-2026 early AM

Stopped for the evening at the start of the final Round 9 of the leg. I hope I can get these done - only 9 spots left to advance! Yikes.

04-01-2026 1AM

Finished! No joke!!! Need to block and photograph, but that’s for tomorrow.

viewed 13 times
Finished
March 22, 2026
April 1, 2026
 
About this pattern
1100 projects, in 54 queues
Kismatt's overall rating
Kismatt's clarity rating
Kismatt's difficulty rating
About this yarn
by Cascade Yarns ®
Fingering
75% Merino, 25% Nylon
437 yards / 100 grams

101619 projects

stashed 76747 times

Kismatt's star rating
  • Project created: March 22, 2026
  • Updated: April 1, 2026
  • Progress updates: 4 updates