Crevetten - My 30th Bohus Project
Finished
January 10, 2020
February 25, 2020

Crevetten - My 30th Bohus Project

Project info
Crevetten - Bohus Stickning Inspired by Annika Malmstrom-Bladini
Knitting
SweaterPullover
Me
S
Needles & yarn
US 0 - 2.0 mm
US 1 - 2.25 mm
AngoraGarnet Bohus Angora-Merino
100
AngoraGarnet
AngoraGarnet Bohus Angora-Merino
96
AngoraGarnet
AngoraGarnet Bohus Angora-Merino
129
AngoraGarnet
AngoraGarnet Bohus Angora-Merino
164
AngoraGarnet
AngoraGarnet Bohus Angora-Merino
277
AngoraGarnet
AngoraGarnet Bohus Angora-Merino
128
AngoraGarnet
AngoraGarnet Bohus Angora-Merino
206
AngoraGarnet
AngoraGarnet Bohus Angora-Merino
192
AngoraGarnet
AngoraGarnet Bohus Angora-Merino
269
AngoraGarnet
AngoraGarnet Bohus Angora-Merino
248
AngoraGarnet
Notes

I’ve been attracted to this Bohus Stickning Design by Annika Malmström-Bladini ever since I saw photos of originals in the museum archives and the original chart published in The Revival.

The Crevetten design was originally offered with either white or coral main colors and altho the chart in the book is for the white MC, I decided to try to recreate it using the coral base.

Notes and links to archive photos to come as I have pages of details to include here and I’m using my interpretation the chart and the handwritten notes along the side plus my experiences in knitting Bohus Stickning pieces.

I hope to see an original Crevetten design some day as so far, I’ve only been able to scout out old photos!

All yarns have been sourced from AngoraGarnet using the lambswool/angora blend.

This design is very symmetrical (no surprise for AMB designs) and so I have tried to keep all my increases very precisely placed with that in mind.

Links:
3 photos of Original Crevetten from Digitaltmuseum (press right arrows to view all 3 photos.)
This wonderful photo was added to the forum by Karen.
Another link by Karen here.
And yet another one from detective Karen!

AngoraGarnet angora/merino blend colors used:
100 (Naturvit)
BS 96
BS 129
BS 164
BS 277
BS 128
BS 206
BS 192
BS 269 MC
BS 248 (in lieu of EJA 270 which I could not find)

A big thanks to dear Pernille who kept getting odd little yarn orders from me over the last 18 months as I tried to put this design together. She hand dyed at least two separate MC yarns and multiple samples from her dye pots until I finally found those to use here.

January 18, 2020

Displeased with the original yoke so began anew without frogging the first so I would have a good comparison. I felt the need to eliminate a yarn that tended towards mauve. Will need good light to pose both side by side but I’m much happier with the new color combo.

January 20, 2020

Second yoke finished. Hoping that when the MC is introduced that it helps to pull things together.

February 1, 2020

Started first sleeve before finishing the bottom of body and I’m very pleased with the new skein blending at this juncture and not needing to alternate skeins although I was prepared to do so.

February 7, 2020

Finished first sleeve and started the second one.

February 11, 2020

Back to knitting the body now that both sleeves are completed.

February 17, 2020

Completed 13” of the body from underarm and finally started knitting the bottom ribbing. Still no issues with the hand dyed color matching of skeins. Whew!

February 23, 2020

Finished lower ribbing and Kitchener sewn bind off. Now picking up neckline stitches and am tempted to do a different collar than a folded 1x1 ribbing. Hmmm.
Update: used the traditional folded ribbed neckline…I’m such a wuss.

February 25, 2020

Finished! Going to weave in all the ends and will block tomorrow and hope to get good photos!

viewed 361 times | helped 2 people
Finished
January 10, 2020
February 25, 2020
 
About this pattern
2 projects, in 2 queues
NancySauerhoff's overall rating
NancySauerhoff's clarity rating
NancySauerhoff's difficulty rating
About this yarn
by AngoraGarnet
Lace
50% Angora, 50% Merino
656 yards / 100 grams

453 projects

stashed 429 times

NancySauerhoff's star rating
  • Project created: January 12, 2020
  • Finished: February 26, 2020
  • Updated: February 28, 2020
  • Progress updates: 6 updates