Claudja Kerchief
Finished
July 4, 2025
July 8, 2025

Claudja Kerchief

Project info
Claudja by Cirilia Rose
Knitting
Other HeadwearKerchief
?
Youth/small adult (8” x 17.5”)
Needles & yarn
US 3 - 3.25 mm
US 5 - 3.75 mm
108 yards = 0.37 skeins
Universal Yarn Bamboo Pop
none left in stash
0.29 skeins = 84.7 yards (77.4 meters), 29 grams
Multicolored
The Knit n Stitch
Universal Yarn Bamboo Pop
321 yards in stash
0.08 skeins = 23.4 yards (21.4 meters), 8 grams
Green
The Knit n Stitch
Notes

Okay, I see I am not the only one to be confused about the instructions. “Do not turn work/slip stitches to beg of needle to be worked again” is just weird. Plus the CDD is too fiddly with moving the marker every row. I think I’ll do as someone others did & do SSK/K2tog on either side of center stitch.

I made one 8” long I-cord on size 3 needles, attached the end to the kerchief & picked up 90 stitches across the top. I switched to the variegated yarn, did 5 rows of SS with the size 5 needle, BO, then made the I-cord for the other end with the solid yarn that I hadn’t cut. Pretty tricky! As I’d hoped, the SS rolled to cover up the messy picked up stitches.

I see I should have CO more stitches since I used DK weight yarn. I think I prefer knitting in the other direction, so I can just continue knitting until the headband part is wide enough.

viewed 3 times
Finished
July 4, 2025
July 8, 2025
About this pattern
61 projects, in 246 queues
Padittle's overall rating
Padittle's clarity rating
Padittle's difficulty rating
About this yarn
by Universal Yarn
DK
50% Cotton, 50% Rayon from Bamboo
292 yards / 100 grams

11596 projects

stashed 10714 times

Padittle's star rating
  • Project created: July 4, 2025
  • Updated: July 8, 2025