Symphony
Finished
May 4, 2025
May 16, 2025

Symphony

Project info
Symphony by Karine LF designer
Knitting
Feet / LegsSocksAnkle
L (co 70)
Needles & yarn
US 1 - 2.25 mm
519 yards = 2.25 skeins
Knit Picks Stroll Fingering
0.75 skeins = 173.3 yards (158.4 meters), 37 grams
Knit Picks Stroll Fingering
0.75 skeins = 173.3 yards (158.4 meters), 37 grams
Knit Picks Stroll Fingering
0.75 skeins = 173.3 yards (158.4 meters), 37 grams
Notes

Idem means repeat.
Rnd 3: p2, sl wyib, yo, psso3
Cuff rnds {1-4) x5, k 1 rnd, begin chart.
After the heel I was confused as to moving on and had to think about it for several days before it made sense to me. First cut CC2. Then using MC and CC that were left hanging, knit across instep rnd 1 chart A, pick up 18 sts to heel continuing chart A. Follow gusset chart for heel. (I had 20 heel sts so only 1 decrease on first decrease rnd.) Pick up another 18 sts and continue same row from chart A. BOR is where it always was. After gusset is finished, decrease to 70 sts. When foot measures 6.75” change to CC2 and do the toe as usual. End chart A after rnd 11.

viewed 9 times
Finished
May 4, 2025
May 16, 2025
About this pattern
2 projects, in 16 queues
RoseGlad's overall rating
RoseGlad's clarity rating
RoseGlad's difficulty rating
About this yarn
by Knit Picks
Fingering
75% Merino, 25% Nylon
231 yards / 50 grams

85272 projects

stashed 63093 times

RoseGlad's star rating
  • Project created: May 4, 2025
  • Updated: May 17, 2025
  • Progress updates: 7 updates