Gradient pack plus the two skeins of handpainted red from the Yarnery, Shop Hop. (Bought a third skein of MC, which was the last one the Yarnery had. Bought a second gradient pack from a live-saving Raveler.)
06-11-2017
CO for the sweater. Finished up through front right shoulder.
06-12-2017
Haven’t done a spreadsheet, so I don’t know how far along I really am. Finished Row 30 of Sleeve cap and neckline shaping.
06-14-2017
Up to row 38 on sleeve cap and neckline shaping. 20 more rows till I get to add in another color…adding another 42 sts to the length of the rows….
06-15-2017
Up to row 46. 15% finished, and I still haven’t reached the point where I divide for the sleeves! I’m so glad I do spreadsheets to add up the stitch counts, because it becomes difficult to see that I’m making progress, otherwise.
06-18-2017
Finished Row 60, first CC stripe. 20% finished.
06-21-2017
Realized I wouldn’t have enough of the MC yarn or the gradient, so returned to the Yarnery and bought another skein of the MC. They no longer had the gradient, so I bought a different CC. Worked the first two CC stripes and realized the CC was violently bright and that I wouldn’t like it. Appealed to two Minnesota groups I thought might have bought the gradient set during Shop Hop to see if anyone would sell it, and found someone! Yay!
Ripped back to the point where the first CC stripe begins and then promptly knit it with the 2nd color in the sequence, rather than the first, so had to rip out again, and re-knit again. Argh.
Currently in the middle of the first wide short-row stripe in MC.
06-23-2017
Finished first CC wide stripe and second MC wide stripe. 33% finished. Really happy with the gradient yarn as CC in this sweater.
06-23-2017
Halfway done with big CC stripe #2. 35% complete
06-24-2017
*&^%$
I just finished the last wide MC stripe, and saw that I was supposed to do waist increases. Argh. Rippety rip rip rip.
Later…
Reknit the stripe.
06-24-2017
Done with the small-to-large stripes. 45% complete.
06-27-2017
Finished the 18 row stripe last night. 50% complete!
06-28-2017
done with the short rows, now working the 4-row stripes
55% finished
06-29-2017
Done with the body stripes! 60% finished
07-01-2017
Hem ribbing complete.
Neck ribbing completed. 66% finished.
05-07-2018
Picking this up after a long break. I think I just need to do the sleeves…
05-08-2018
Working my way down the first sleeve. Hoping to have the cardigan done in the next week. 70%
I just realized I have the neck ribbing and buttonband done, but not the buttonhole band. And I remember buying buttons for this thing…I will have to find them.
05-09-2018
Finished 12 of 15 rnds of 1x1 ribbing for the first sleeve cuff when the skein ran out. Will need to wind up the last skein. 80% complete
05-10-2018
first sleeve completed, and ends woven in on all the stripes.
05-13-2018
Two more stripes (the rust and a MC) and the cuff left to go on the second sleeve. 90%
05-14-2018
Last of the colored stripes completed. Just a 1/2 stripe of MC and the sleeve ribbing, and then the buttonband.
05-19-2018
Didn’t make a note of the needle I used to do the neck and button band last year, so I guessed that I used a 3 mm needle, since that’s what the pattern called for. I think I may have used a US 2/2.75 mm or even a 2.5mm. Trying to decide whether to take out the button band and reknit, because I think the buttonhole band lies better. Guess I’ll block the cardi and then see what I think.
05-23-2018
Buttons sewn on. Finished! (And it seems to fit!)