Steeplechasers
Finished
December 21, 2012
December 13, 2014

Steeplechasers

Project info
Basic Adult Toe-Up Sock Pattern (Max Version) by Vintage Purls
Knitting
Feet / LegsSocksMid-calf
the fella
puttoparty on ravelry
Men's Medium
Needles & yarn
US 3 - 3.25 mm
madelinetosh DK Twist
230 yards in stash
1.08 skeins = 270.0 yards (246.9 meters)
Orange
Madelinetosh.com
November 8, 2012
Notes

For those keeping score at home, just under two years for one pair of socks.

December 13 2013

  • First skein ends at Round 41 of leg of Sock #2
  • Begin second skein (121.5g).
  • Finished R41 and went on to knit through round 60
  • 1x1 ribbing for rounds 51-60.
  • Aaaand…Bind-off!
  • Ends woven and frayed but not cut. Need a soak and a block first.

June 13 2013

  • Round 54-60: [k1,p1]
  • BO in pattern using Jeny’s Surprisingly Stretchy Bind-Off
  • SOCK #1 COMPLETE
  • Used 65g of Skein #1 (122g)
  • CO SOCK #2
  • Repeat Sock #1 procedures over next year or so.

June 11 2013

  • Round 41-44: Knit to end of round.
  • Round 45: [k1, k2tog, knit to last stitch on needle, m1L, k1]
  • Round 46-50: Knit to end of round.
  • Round 51-53: [k1,p1]

June 8 2013

  • Round 6-Round 29: Knit
  • Round 30: [K1, m1, knit to end of needle]
  • Round 31-34: Knit to end of round.
  • Round 35: [K1, m1, knit to end of needle]
  • Round 36-39: Knit to end of round.
  • Round 40: [K1, m1, knit to end of needle]

24 stitches per needle, 48 stitches total.

January 9 2013

  • Ripped back to 7 gusset increase rows and reknit heel.
  • After heel, knit 2 rows stockinette before try-on.
  • Fit=Perfect.
  • Rnd 3: Top - knit to last two stitches, ssk. Bottom - k2tog, knit to end of round
  • Rnd 4: Top - k2tog, knit to end of needle. Bottom - knit to last two stitches, ssk
  • Round 5: Knit to last three stitches on first needle, ssk, knit last stitch. Repeat for second needle.

Total: 42 sts, 21 on each needle. Boy has some slender-ass ankles and calves.

January 4 2013

  • Finished the heel
  • Tried the sock on the fella: Woe! Heel too large!
  • Ripped back to top of the gusset (42sts at sole).
  • Still need to rip back, probably two increases worth.
  • Which is what my calculator told me.

January 3 2013

  • Worked 9 increase rows for gusset (increase from 24 sts to 42 sts on sole)

January 1 2013

  • Knitted 60 rows from base of toe to 9cm less than length of foot
  • Began gusset

December 21 2012

  • CO 12
  • Increased to 48 stitches around (24 sts/4”)
viewed 160 times | helped 2 people
Finished
December 21, 2012
December 13, 2014
 
About this pattern
146 projects, in 56 queues
astralbath's overall rating
astralbath's clarity rating
astralbath's difficulty rating
About this yarn
by madelinetosh
DK
100% Merino
250 yards

12520 projects

stashed 19464 times

astralbath's star rating
  • Project created: December 26, 2012
  • Finished: December 14, 2014
  • Updated: December 28, 2014
  • Progress updates: 4 updates