Recipient (er, Dad) featured in first two photos.
Thursday Dec 1, 2011:
Swatched for Sailor’s Rib. Used a US7, got 20sts-30rows/4”.
Friday Dec 2, 2011
First draft of cowl pattern
Saturday Dec 3, 2011
Second draft
Sunday Dec 4, 2011
- Printed pattern, changed my mind, printed again.
- Cast on 100 using US9 and German Twisted. Knit 3 rows, switching to #7s.
- Decide cast-on looks flimsy.
- Frog.
- Edit pattern: cast-on changed from 100 to 90.
- Edit pattern: Removed 4-row repeat
- Edit pattern: Needle size changed to US 8 (5mm).
- Cast-on becomes a tubular from JMCO on US 10. Just planned though. Nothing happened yet.
Tuesday December 6, 2011
-
Tubular cast-on using Judy’s Magic Loop on US 10 circular’s with 32” cord.
-
Drop some stitches. Lifted stitches but from wrong side. This can be hidden on inside of the cowl, so I do it.
-
Complete 5 rows of ribbing, not including transition row (from #10 to #8 16” circular).
Wednesday December 7, 2011
- Had to frog halfway through first knit row (7). Cast on, same.
- 6 Rows ribbing, Knit Row, Purl Row, first row of cartridge rib completed (10 rows total).
Thursday December 8, 2011
Completed through Round 26:
- Bottom-edge 1x1 ribbing
- Cartridge ribbing
- First 4-row Sailor’s Rib Motif.
Friday December 16, 2011
* Shortened center sailor’s rib motif to
8 repeats.
* Abbreviated top to exclude cartridge
rib
* Knitted first 4 rows of final k1,p1
ribbing as usual.
* Row 5 - slipping purls purlwise wyif,
knitted knits.
* Row 6 - slipped knits purlwise wyib,
purled purls
* Slipped knits purlwise onto one US10
circular.
* Slipped purls purlwise onto another,
parallel US 10 circular on the inside
of the round, alternating between
needles.
* Grafted bindoff to follow (kitchener).
Sunday December 18, 2011
* Learned and executed grafted bindoff,
event-free.
* Now soaking cowl.