Anders Tee
Finished
September 1, 2025
September 27, 2025

Anders Tee

Project info
Anders Tee by Johanna Gehrisch
Knitting
TopsTee
s
Needles & yarn
US 4 - 3.5 mm
US 7 - 4.5 mm
Brown Sheep Cotton Fleece
4 yards in stash
3.98 skeins = 855.7 yards (782.5 meters), 398 grams
Purple
Thrifted
Notes

August 26, 2025

Making smallest size using US 6 for a tighter weave.

Frogged after joining in the round. I decided to go up a needle size from US 6 to US 7. The neckline was too tight and I want it to be more breezy like my Tolsta or Ranunculus.

Will be restarting soon. Thinking I might cast on a larger size for a wider neckline and modifying to keep a size small for the circumference

September 4, 2025

Whoops, forgot to cast on the larger size. Oh well. I’m not restarting again. I will consider a different collar - shorter ribbing (think take turns tank), I cord, double knit, rolled stockinette….

September 23, 2025

Each diamond is about 2”

Using the braided join to avoid weaving in ends and it’s working incredibly.

I used two skeins for the collar, 9” yoke, and 9” of body, then left the body on hold to make the sleeves.

Just finished first sleeve. 6 diamonds from underarm to cuff. Finished on row 1, dropped down to ribbing needle size for 1 straight stockinette round, then decrease round, then ribbing. I need to finish cuff and will pick up the second sleeve tomorrow.

September 26, 2025

Finished second sleeve. Back to finish the body and decide on the collar.

September 27, 2025

10 rounds for collar and knitted it down. 2 grams of yarn remain so I could possibly knit a couple more rounds if I don’t like the shorty collar.

viewed 10 times
Finished
September 1, 2025
September 27, 2025
About this pattern
92 projects, in 313 queues
chrisdee's overall rating
chrisdee's clarity rating
chrisdee's difficulty rating
chrisdee's adjectives for this pattern
  1. Translation issues
About this yarn
by Brown Sheep
Worsted
80% Pima, 20% Merino
215 yards / 100 grams

17450 projects

stashed 13824 times

chrisdee's star rating
chrisdee's adjectives for this yarn
  1. Bleeds
  • Originally queued: June 23, 2025
  • Project created: August 22, 2025
  • Updated: September 28, 2025
  • Progress updates: 2 updates