Les vacances d'Hercule Poirot
Finished
April 26, 2019
June 8, 2019

Les vacances d'Hercule Poirot

Project info
Les vacances d'Hercule Poirot by TripleLdeMag (Magdalena), HathorKnits (Célia), lapindalice (Alice)
Knitting
Neck / TorsoShawl / Wrap
Needles & yarn
US 4 - 3.5 mm
839 yards = 1.92 skeins
The Woolly Skein Fingers Crossed
4 yards in stash
0.99 skeins = 433.1 yards (396.0 meters), 99 grams
Orange
knit eat
April 7, 2019
The Woolly Skein Fingers Crossed
31 yards in stash
0.93 skeins = 406.8 yards (372.0 meters), 93 grams
Brown
knit eat
April 7, 2019
Notes

section 2 : for the mosaic knitting to work, you need to slip stitches purlwise with yarn in back on right side rows, and slip them purlwise with yarn in front on wrong side rows.

section 2 : there is an easier way to knit the cables without using a cable needle. You can do it as follows.

When the pattern calls for you to 1/1LC --> skipping first st, knit second st on LH needle through back loop. Then knit both first and second sts on LH needle together through back loops, then slip both sts off LH needle at once.

When the pattern calls for you to 1/1RC --> k2tog, leave sts on LH needle, then knit first st on LH needle, then slip both sts off LH needle at once.

25-05-2019

It’s worth mentionning that when the pattern gives you the number of stitches you should have on your needles, it doesn’t count the yarn overs at the beginning and end of the rows.

viewed 106 times | helped 10 people
Finished
April 26, 2019
June 8, 2019
About this pattern
203 projects, in 505 queues
crazybutsound's overall rating
crazybutsound's clarity rating
crazybutsound's difficulty rating
About this yarn
by The Woolly Skein
Fingering
100% Merino
437 yards / 100 grams

527 projects

stashed 332 times

crazybutsound's star rating
  • Project created: April 25, 2019
  • Finished: June 8, 2019
  • Updated: June 23, 2019
  • Progress updates: 8 updates