keribeth >
notebook > projects > Dreams of Aran
Dreams of Aran
© keribeth

5/13 First sleeve done!

5/10 Five skeins in. The sleeve is fun! I much prefer the antler cable to the honeycomb.
5/5 Wow the separated back and front went really quickly! On to sleeves! (Am I done honeycombing? Whew!)
© keribeth
© keribeth

5/4 Four skeins in. Finished the separated back section and starting the front.

4/30 Knitting by the river on a school field trip.

4/28 Three skeins in!

4/23 Two skeins in, with azaleas and my friend’s dog. I learned that if I slip the stitches from the cable needle back onto the left needle before I knit them the honeycomb section is easier.

Now at 38-40” around unstretched which is good. The honeycomb section is so tight to cable and I dread it.

4/17 End of first skein. I feel like this should have gone further? I guess cables really eat yarn. I think I’ve got like 11 of these so hopefully that will be enough.

This is much smaller than it’s supposed to be—maybe 38” around at most—so I’m going to switch from sixes to sevens. I don’t want to rip out what I’ve done so hopefully I can just block out any size difference.

This was helpful for about five minutes until I realized I didn’t need it anymore.
photos above
©
keribeth
unless otherwise noted
unless otherwise noted
Dreams of Aran
viewed 570 times
|
helped
2 people
Finished
Progress
100%
April 13, 2021
May 22, 2021
About this pattern
by DROPS design
from Drops 135
keribeth's overall rating

About this yarn
by Cascade Yarns ®
Worsted
100% Wool
220 yards
/
100
grams
88535 projects
stashed
46996 times
keribeth's star rating
- Project created: April 13, 2021
- Updated: January 8, 2022
- Progress updates: 2 updates