Started first sleeve:
- long-tail cast-on, ndl 2.5 mm
- 19 rows ribbing
- change to ndl 3.25 and reset row counter
09-08-2022
- row 5 is 1st INCR row
- next INCR row is row 15, 25, 35, 45, 55, 65
- next INCR row is row 77, 89, 101
- next INCR row is row 115 Total number of sts. is now 82
27-08-2022
First sleeve is finished at row 200, sleeve is about 53 cm long.
12-09-2022
Second sleeve done, ended at row 197.
16-09-2022
Body:
1st buttonhole in r4
2nd buttonhole in r22
17-09-2022
Ribbing is 30 rows, continuing with larger ndls and setup row in r31.
18-09-2022
R32 is the first row of the lace panel (r1-16) and I’ve reset the row counter, so row 1 of the lace panel is now 1 on the counter.
18-09-2022
Next buttonhole should be in r9.
21-09-2022
4th buttonhole in r27
5th in r45
6th in r63
29-09-2022
Next button row is r81
02-10-2022
Row 96 completed, 6 repeats have now been completed, length from cast-on is about 32 cm.
Next buttonhole is in r99
05-10-2022
The sleeves were joined to the body after 6 patt repeats, with r97.
To add length to the sleeve-to-neck part, I spread out the first few dec rows:
first dec row in r101
next dec row in r105
next dec row in r109
Next button row is r 117.
08-10-2022
Next dec row in r113
11-10-2022
Next button row in r135
13-10-2022
Oops, after finishing r129 I noticed that the sleeves were joined incorrectly! I’ve undone everything until the sleeves adding part, now back at row 97 and starting over with joining sleeves to body and decrrasing…
16-10-2022
1st dec row: r99 (also buttonhole row)
next dec row: r103
next dec row: r107
next dec row: r111
next dec row: r113
From here on every RS row is dec row for total of 27 times.
Button holes in the following rows:
r117
r135
r153
27-10-2022
The last few rounds I skipped the decr row a few times to make the yoke longer. I ended all before the bo part with r167, then did the collar.
All is done except the buttons and the blocking!