Zoe's striped bias baby blanket
Finished
September 10, 2011
December 8, 2011

Zoe's striped bias baby blanket

Project info
Bias Blanket by Jennifer Casa
Knitting
BlanketBaby Blanket
Zoe Reese
Needles & yarn
US 7 - 4.5 mm
407 yards = 2.38 skeins
Bernat Cottontots Solid
243 yards in stash
0.33 skeins = 56.4 yards (51.6 meters), 33 grams
212575
Green
Casey’s Crafts in Langley, Washington
February 6, 2010
Bernat Cottontots Solid
200 yards in stash
2 skeins = 342.0 yards (312.7 meters), 200 grams
226756
White
Casey’s Crafts in Langley, Washington
February 6, 2010
Bernat Cottontots Solid
none left in stash
0.05 skeins = 8.6 yards (7.8 meters), 5 grams
212576
Pink
Casey’s Crafts in Langley, Washington
February 6, 2010
Notes

12/8/11
Looking at the fabric I had and the blanket as-is, I decided against putting anything on the back. I hope Robin likes it that way, and I hope if she doesn’t like it, she won’t tell me. :) I love the blanket and might have to make one for myself, the stripes are so darn cute.

12/6/11
Finished weaving in the ends, now just need to add the backing fabric… Sewing that on will be interesting. I’m going to see Robin on Friday, so I gotta finish it now…

This is the pattern I ended up with to make the blanket an actual square. The goal was to increase/decrease 6 stitches over 4 rows:

  • 64 rows white
  • 10 rows green
  • 8 rows white
  • 2 rows pink
  • 8 rows white
  • 8 rows green — then reverse this & decrease.

CO 3 st and K 1st row.
K1, p1, M1, K1.
K1, p1, M1, p1, K1.
K1, p1, M1, K1, p1, K1.
K1, p1, M1, p1, K1, p1, K1.

Increase rows:

  • RS row 1 = K1, p1, K1, yo, K until 3 st remain, yo, K1, p1, K1
  • WS row 2 = K1, p1, K1, M1L, P until 3 st remain, M1R, K1, p1, K1
  • RS row 3 = K1, p1, M1R, K until 3 st remain, M1L, p1, K1
  • WS row 4 = p all stitches

Decrease rows:

  • RS row 1 = K1, p1, K2tog, K until 4 st remain, SSK, p1, K1
  • WS row 2 = K1, p1, K1, P2tog, P until 5 st remain, P2tog, K1, p1, K1
  • RS row 3 = K1, p1, K1, yo, K2tog, K until 6 st remain, SSK, yo, K1, p1, K1
  • WS row 4 = same as WS2 Repeat the RS + WS sequence until 6 st remain.

K1, K2tog, K3. (5 st)
K1, K2tog, K2. (4 st)
K1, K2tog, K1. (3 st)
K3tog, cut yarn and pull through the loop

10/12/11
The blanket was coming out too diamond-shaped, plus I was lazy about my decreases and the sides didn’t match. I frogged the whole thing. Thankfully, it knits up very fast.

9/10/11

  • 80 rows white
  • 10 rows green
  • 20 rows white (decr. at 10th)
  • 10 rows green
  • 80 rows white Pattern: CO 3 st and K 1st row. K1, p1, Kf+b, K to end of row. Repeat this until you have 6 st on your needles.

Increase rows:

  • RS row 1 = K1, p1, K1, yo, K until 3 st remain, yo, K1, p1, K1
  • WS row 2 = K1, p1, K1, P until 3 st remain, K1, p1, K1
  • RS row 3 = K1, p1, Kf+b, K until 3 st remain, Kf+b, p1, K1
  • WS row 4 = same as WS2

Decrease rows:

  • RS row 1 = K1, p1, K1, yo, K2tog, K until 5 st remain, K2tog, yo, K1, p1, K1
  • WS row 2 = K1, p1, K1, P2tog, P until 5 st remain, P2tog, K1, p1, K1
  • RS row 3 = K1, p1, K2tog, K until 4 st remain, K2tog, p1, K1
  • WS row 4 = same as WS2

Repeat the RS + WS sequence until 6 st remain.

  • K1, K2tog, K3. (5 st)
  • K1, K2tog, K2. (4 st)
  • K1, K2tog, K1. (3 st)
  • K3tog, cut yarn and pull through the loop

Use stripes, yarnover edge, and crocheted ties like the Sierra Blanket

Also http://www.ravelry.com/projects/sarasuzie/bias-blanket

Tie & bows: Using 2 strands of cc and crochet hook, chain until you have enough to weave thru eyelets from the starting point (leaving enough for a tie), along 2 sides and leave enough to tie with at the finishing point. Repeat for the other side. Tie bows at both points.

viewed 73 times
Finished
September 10, 2011
December 8, 2011
About this pattern
306 projects, in 429 queues
morgybear's overall rating
morgybear's clarity rating
morgybear's difficulty rating
About this yarn
by Bernat
Worsted
100% Cotton
171 yards / 100 grams

7707 projects

stashed 5041 times

morgybear's star rating
  • Originally queued: September 4, 2011
  • Project created: September 11, 2011
  • Finished: December 8, 2011
  • Updated: May 9, 2013
  • Progress updates: 7 updates