charming fuchsia
Finished
March 5, 2026
April 1, 2026

charming fuchsia

Project info
Sylven by Natasja Hornby
Knitting
SweaterPullover
TopsTee
myself
3
Needles & yarn
US 4 - 3.5 mm
US 5 - 3.75 mm
21 stitches and 30 rows = 4 inches
in Vertical Line Pattern
2,597 yards
Lana Grossa Landlust Sommerseide
558 yards in stash
7 skeins = 1301.4 yards (1190.0 meters), 350 grams
woll.werk in Krems, Niederosterreich
July 4, 2025
Zauberwiese Silk Yak Cobweb
16 yards in stash
0.79 skeins = 1295.9 yards (1185.0 meters), 79 grams
Zauberwiese gift
Notes

holding yarn double to reach gauge.
——————
Armhole shaping: knitted 20cm instrad of 18cm
——————
Front left shoulder:
PU 34sts. instead of 33sts.
Started slightly altered Vertical Line pattern to align with the front pattern: k5 instead of 4, remaining row as per pattern.
——————
Front right shoulder
PU 34sts, instead of 33sts.
slightly altered Vertical Line pattern: K8 insread of 7, remaining row as per pattern
——————
Body: CO as per size 3 = 2x6sts.
knit 32cm before lace border
——————
Lace Border = 36rows, in my case = 10cm
——————
used 6 balls of Sommerseide for the body = 1.020m
used 70g of my 80g cobweb yarn = 1.050m
only 10g left, so I will omit that yarn for the sleeves and will add the cobweb yarn for the sleeve ribbing only.
Will use 3.5mm needles for the Sommerseide
——————
Sleeves with the Landlust yarn only on 3.5mm needles: CO 2x47sts.(94), reducing on last short row to 88sts. After that I reduced 2sts. every 6th row, down to 72sts., knitted one row, followed by 3cm (14rows) 1/1 ribbing with both yarns.

viewed 229 times | helped 2 people
Finished
March 5, 2026
April 1, 2026
 
About this pattern
382 projects, in 704 queues
mosil1949's overall rating
mosil1949's clarity rating
mosil1949's difficulty rating
About this yarn
by Zauberwiese
Cobweb
50% Silk, 50% Yak
1640 yards / 100 grams

19 projects

stashed 31 times

mosil1949's star rating
About this yarn
by Lana Grossa
DK
50% Cotton, 50% Silk
186 yards / 50 grams

1836 projects

stashed 1359 times

mosil1949's star rating
  • Originally queued: March 29, 2025
  • Project created: February 24, 2026
  • Finished: April 1, 2026
  • Updated: April 14, 2026
  • Progress updates: 8 updates