Zeva
Finished
April 13, 2022
May 15, 2022

Zeva

Project info
Zeva by Laura Aylor
Knitting
TopsTee
L - with smaller gauge to make a M2 size
Needles & yarn
US 2 - 2.75 mm
26 stitches and 38 rows = 4 inches
in blocked stockinette
ULA+LIA Fingering Mongolian Baby Camel Wool
1445 yards in stash
1.94 skeins = 834.2 yards (762.8 meters), 194 grams
Brown
Kickstarter
June 1, 2021
Notes

April/May 2022 Garment KAL - Yarn choice assumes I get gauge

Initial swatch on US 3 was 24 stitches and 36 rows to 4” pre blocking. I’ll need to drop another needle size or two further but will block first to see how much it grows before trying again.

Blocked swatch did not grow in stitch count, but row count stretched significantly. Will move to a US1 for the next swatch.

US1 swatch 28 stitches by 40 rows in 4” now it’s too tight of a gauge.

Pattern calls for 22.5 stitches per inch, but i prefer the fabric from the smaller gauge, so I’m going to work on US2 with a gauge of 26 stitches per 4”. The sweater calls for up to 6” of positive ease, which is too big for my taste. So here’s the thought:

Real body size is 38” at the bust, so M1. But positive ease would put me into an M2 at 42”. But 42/4 = 10.5 4” sections and I’m getting 3.5 more stitches per each 4” section making the whole thing (3.5 X 10.5) 36.75 stitches too small and that means I’d be 5-6” smaller than called for putting me at a 36” size. Ugh.

Cast on for the L at 48” would have me landing about 8” smaller or a 40” diameter for 2” of positive ease. I think. This is going to be an interesting experiment!

04-14-2022

Cast on, made it through the beginning increases to the join, and am about 1/3 of the way through the increases leading to splitting off the sleeves. Simple knit, no issues yet, and happy with this luxury fiber.

05-08-2022

Finished the body and the bind off of the body today. Next up - the neck trim, and then off to sleeve island. It’s going to be a nailbiter to get this one done in time for the KAL.

05-15-2022

Off the needles and immediately into the soak. No changes required at all - just waiting for her to dry so I can get her marked as finished.

viewed 135 times
Finished
April 13, 2022
May 15, 2022
About this pattern
85 projects, in 274 queues
rjc537's overall rating
rjc537's clarity rating
rjc537's difficulty rating
About this yarn
by ULA+LIA
Fingering
100% Camel
430 yards / 100 grams

164 projects

stashed 410 times

rjc537's star rating
  • Originally queued: March 27, 2022
  • Project created: April 14, 2022
  • Updated: May 24, 2022
  • Progress updates: 3 updates