Sienna's 2024 Sweater
Finished
April 17, 2024
April 27, 2024

Sienna's 2024 Sweater

Project info
Knitting
Sienna
11/12
Needles & yarn
4.75 mm
US 9 - 5.5 mm
US 10 - 6.0 mm
16 stitches and 22 rows = 4 inches
in Stocking stitch
1,608 yards
Garnstudio DROPS Brushed Alpaca Silk
5.25 skeins = 803.3 yards (734.5 meters), 131 grams
Purple
Wool Warehouse
Garnstudio DROPS Merino Extra Fine
7 skeins = 805.0 yards (736.1 meters), 350 grams
Pink
Notes

Using this pattern to make a junior sized sweater cropped and baggy. Shortening the sleeve length.

MEASUREMENTS
Bust: 18 1/4” across
Length: (55)
Width overarm: 6” across
Sleeve length, underarm: 14”

SUGGESTED KNITTING NEEDLES
4.75mm, 5.5mm and 6 mm

TENSION
16 sts x 22rows = 10 cm

BACK AND FRONT
With the double yarn and 4.75mm needle tubular cast on 168sts.

Join and change to 5.5mm needles. work 2”ribbing

Insert marker at sides with 84sts for each side, front and back.

Change to 6 mm needles.

Decrease the number of stitches thus:
Front: K2, k6, k2tog 10 times, K2, (74sts)
slip marker,
Back: K2, k6, k2tog 10 times, K2 (74sts)

Continue in Stocking stitch until work measures 12”

Cast off 6 sts at each side for armholes (68st)

SLEEVES
With the double yarn and 5mm tubular cast on 32sts.

Join and change to 5.5mm needles. work 8 rows ribbing

Insert marker between first and last st of rnd.

Change to 6 mm needles.

Knit 2 rounds in stocking stitch

Next round increase 1 st at each side of marker while continuing knitting stocking stitch. .

Rep inc rnd every 5cm until 52 sts.

Cont until sleeve is 15”

Cast off 6 sts at center underarm (46st)

Knit the second sleeve.

RAGLAN

Transfer sleeve sts to the 6 mm needle: 46 left sleeve + 68 front + 46 right sleeve + 68 back = 228 st

Knit one round while,at the same time, at each junction k2tog to make raglan sts 224sts.

Place markers both before and after each of the K2tog stitches that joined the sleeves to the front and back at each intersection.

Knit 2 rounds

HOW TO MAKE THE RAGLAN STITCH DECREASES:

knit to 2 stitches before the markers, knit 2 together, slip marker, knit 1, slip marker, slip stitch knit ways, slip stitch purl ways, insert left needle into the two slipped stitches in front of the work, then knit them together at that point

Rep dec on alt rnds 13 times = 88st

SHORT ROWS TO LIFT THE BACK
https://youtu.be/SCgycxLce94

Short rows st are made at:
on the front of the sweater 3 st after each of the front raglan markers

and at:
on the sleeves of the sweater 3 st after each of the back raglan markers

And at:
on the back of the sweater 3 st before each of the back raglan markers.

There are 68 st remaining.

Change to 5.5mm needles

NOTE: You will have to decrease 1 st on the front and one 1 on the back so that there are uneven stitches between the three raglan stitches. (66st)
NOTE: On the neck ribbing you will want a knit/purl/knit to carry on for those three raglan stitches.

3 raglan +3 sleeve +3 raglan + 25 front +3 raglan +3 sleeve +3 raglan +23 back = 66st

FINISHING, NECKBAND
Change to a 5.5mm needle and knit a 1x1 ribbing for 3 rounds.

Change to a 5mm needle and continue ribbing for 3 more rounds.

Tubular bind off. https://m.youtube.com/watch?si=RJXQ8Ehov_xsv0ds&v=FNb...

Sew armhole openings. https://www.knittinghelp.com/video/play/kitchener-stitch

viewed 26 times
Finished
April 17, 2024
April 27, 2024
About this pattern
Personal pattern (not in Ravelry)
About this yarn
by Garnstudio
DK
100% Merino
115 yards / 50 grams

43954 projects

stashed 21095 times

saskgayle's star rating
About this yarn
by Garnstudio
Worsted
77% Alpaca, 23% Bombyx
153 yards / 25 grams

30309 projects

stashed 21047 times

saskgayle's star rating
  • Project created: April 17, 2024
  • Finished: April 27, 2024
  • Updated: August 30, 2024
  • Progress updates: 3 updates