Alpenglow 2023 Summer KAL
In progress
Progress
15%
July 1, 2023
work in progress

Alpenglow 2023 Summer KAL

Project info
Alpenglow by little m Expressions
Knitting
Neck / TorsoShawl / Wrap
September 30, 2023
Needles & yarn
7.0 mm
13 stitches and 32 rows = 4 inches
in Garter Stitch, blocked
1,316 yards = 4 skeins
Expression Fiber Arts Yak Merino Sport
1 skein = 329.0 yards (300.8 meters), 100 grams
480455
Blue
Expression Fiber Arts
Expression Fiber Arts Yak Merino Sport
1 skein = 329.0 yards (300.8 meters), 100 grams
480459
Purple
Expression Fiber Arts
Expression Fiber Arts Yak Merino Sport
1 skein = 329.0 yards (300.8 meters), 100 grams
480458
Red
Expression Fiber Arts
Expression Fiber Arts Yak Merino Sport
1 skein = 329.0 yards (300.8 meters), 100 grams
489456
Green
Expression Fiber Arts
Notes

Using same yarn and colors as listed in the pattern. Why mess with perfection?

7/1 caked yarn
7/2 did a guage swatch with size 8 needles. Not enough stitches per inch. Loved the fabric, but concerned about running out of yarn for color A. Decided on size 7 needles. First time I don’t absolutely hate the look of my garter tab. Was confused about the short rows, but they had a great video showing exactly what to do. Finished up to Row 66. 154 stitches
7/3 Finished twilight section A short row section and started the mountan panel. Ended on MP6. 217 stitches
7/4 Holding my breath that I don’t run out of color A. The cake looks so small now. Ended on MP30. 265 stitches
7/5 Finished mountain panel. MP48 302 stitches
7/6 Started Twilight Section B. Ended at Row 96 328 stitches
7/7 Ended at Row 99 336 stitches
7/8 Running low on color B yarn so had to change up some rows. Did 105-108 in color B then 109-120 in color C. Ended at Row 124 394 stitches

Hoping 13 grams of colo B will be enough for SRJ
Didn’t run out of color A 3 grams left

07-09-2023

Finished Twilight Section B 406 stitches. Markers in every 14 stitches for edging.

Was able to do SRJ with Color B. 2 grams left after other changes above.

36 grams of Color C left.

07-15-2023

After several false starts finished first 4 repeats of edging. 25 to go.

07-16-2023

Finished 15 repeats - 14 to go.

viewed 18 times | helped 1 person
In progress
Progress
15%
July 1, 2023
work in progress
About this pattern
95 projects, in 47 queues
sunflowerterry's overall rating
sunflowerterry's clarity rating
sunflowerterry's difficulty rating
About this yarn
by Expression Fiber Arts
Sport
70% Merino, 30% Yak
329 yards / 100 grams

175 projects

stashed 439 times

sunflowerterry's star rating
  • Project created: July 1, 2023
  • In progress: July 1, 2023
  • Updated: July 16, 2023
  • Progress updates: 2 updates