DJO - Black Frame
Finished
May 21, 2025
July 14, 2025

DJO - Black Frame

Project info
Djo by Sophie Ochera
Knitting
SweaterPullover
Me
XL
Needles & yarn
US 4 - 3.5 mm
US 6 - 4.0 mm
1,854 yards
Alpaca Brushed 325
970 yards in stash
2.27 skeins = 806.8 yards (737.8 meters), 227 grams
Nero 13
?
Black
Garnudsalg
Filcolana Tilia
87 yards in stash
0.42 skeins = 96.5 yards (88.2 meters), 10 grams
65
Brown
Filcolana Tilia
55 yards in stash
0.5 skeins = 114.8 yards (105.0 meters), 12 grams
355
56
Green
Yarnfreak
Garnstudio DROPS Kid-Silk
1148 yards in stash
2 skeins = 459.3 yards (420.0 meters), 50 grams
F215037
Green
Strikkenyheder
Garnstudio DROPS Kid-Silk
0.28 skeins = 64.3 yards (58.8 meters), 7 grams
04
74412
Pink
Garnstudio DROPS Kid-Silk
363 yards in stash
0.42 skeins = 96.5 yards (88.2 meters), 10 grams
F239039
Blue
Strikkenyheder
Garnstudio DROPS Kid-Silk
115 yards in stash
0.2 skeins = 45.9 yards (42.0 meters), 5 grams
F02906
Blue
Strikkenyheder
Garnstudio DROPS Kid-Silk
none left in stash
0.44 skeins = 101.0 yards (92.4 meters), 11 grams
6110
Purple
Strikkenyheder
Sandnes Garn Tynn Silk Mohair
none left in stash
0.3 skeins = 69.6 yards (63.6 meters), 7 grams
41182
Purple
Ønskegarn
March 17, 2018
Notes

Colours and yarn
MC: Black Alpaca brushed

CC1: Black Alpaca brushed
CC2: Dark green
CC3: Dark purple
CC4: Dark blue
CC5: Yellow / Brown
CC6: Light blue
CC7: Light green
CC8: Light purple

MC + CC1: one strand
CC2-CC8: mohair held double


Modifications
Cast on neck and neck ribbing
Cast on 16 sts
Knit in the round
Work 3 cm in ribbing
Change needle
M1L
Knit 1 rnd
Increase rnd

I grew a little tired of the pattern on the main part of the body so I made some alternations to the sleeves. See below.

Left sleeve
Didn’t do rnds 50-63 as shown in diagram.
Instead did 7 extra rnds after row 90 in diagram:
rnd 91: MC
rnd 92 + 93: repeat rnd 90-91 (mirrored but moved)
rnd 94: MC
rnd 95 + 96: repeat rnd 90-91
rnd 97: MC

Right sleeve
Didn’t do rnds 1-14
Instead added an extra rnd between rnd 47 and 48 as well as 6 extra rnds after end of diagram.
rnd between 47 and 48: MC
rnd 95: MC
rnd 96: MC
rnd 97: repeat rnd 94 but moved slightly
rnd 98: MC
rnd 99: MC
rnd 100: repeat rnd 94

viewed 27 times
Finished
May 21, 2025
July 14, 2025
About this pattern
Djo
241 projects, in 962 queues
williams98's overall rating
williams98's clarity rating
williams98's difficulty rating
About this yarn
by Garnstudio
Lace
75% Mohair, 25% Silk
230 yards / 25 grams

71886 projects

stashed 35262 times

williams98's star rating
About this yarn
by Filcolana
Lace
70% Mohair, 30% Silk
230 yards / 25 grams

16463 projects

stashed 6640 times

williams98's star rating
About this yarn
by Sandnes Garn
Lace
57% Mohair, 28% Silk, 15% Wool
232 yards / 25 grams

21174 projects

stashed 9474 times

williams98's star rating
  • Project created: May 18, 2025
  • Finished: July 14, 2025
  • Updated: Today
  • Progress updates: 8 updates