Kippy's Flourish skirt
Finished
March 29, 2014
June 3, 2014

Kippy's Flourish skirt

Project info
Flourish by Rhonda "TurquoizBlue" Davis
Crochet
Skirt
moi
S
Hooks & yarn
3.5 mm (E)
Garnstudio DROPS Safran
Garnstudio DROPS Safran
Garnstudio DROPS Safran
Knit Picks Comfy Fingering
Knit Picks
Notes

(April 1, 2014) just started, and this is another adventurous challenge - just completed the first two flower motifs, and connected them - this pattern gives instructions so that the motifs are all crocheted together in bands. Both diagrams and written instructions are included in this pattern - Hooray!

(May 2) uploading photos which I took in April after starting - love this pattern, took a break from crocheting as I was so busy at home; then made a shawl which I needed to wear - something to wrap around my shoulders for the hot weather here. Pressing on~

(May 14) photos showing two rows of the skirt completed~ Added a touch of color as I was going along ~
(lavender colored Safran yarn by =DROPS

(May 22) just completed the fourth row of the skirt - one more row left (of eight flowers), then finishing the waist, the bottom edging….then the blocking ~ added more colors, also Safran cotton yarn by DROPS

(May 27) just one more flower motif to go in the last row of the skirt ~39 floral motifs done and connected; one more left

(May 28) skirt body completed~ began weaving in loose ends of the 40 flower motifs

(May 29) finished weaving in ends; crocheted the loose ends of the hem line into the hem edging. Started the waist ~

(May 30) finishing up waist
(May 31) finished waist, but did not follow the directions properly as it is about an 18” waist :/

(June 2 ) frogged the waist back to where my mistake began (row 2 of waist) and have begun anew -

(june 3) finished~ except for the blocking - am uploading a pre-blocking photo! also, will make an underskirt, and a new tie for the waist (in the photo I used white ribbon as the tie)

(june 9 -10) finger blocked after gentle washing by hand, and laid out on towels on a laundry rack to dry - looks great! and the yarn looks lovely ~ (1st two photos blocking in the sun)

viewed 75 times | helped 2 people
Finished
March 29, 2014
June 3, 2014
About this pattern
3 projects, in 31 queues
SkippyRabbit's overall rating
SkippyRabbit's clarity rating
SkippyRabbit's difficulty rating
About this yarn
by Garnstudio
Sport
100% Egyptian
175 yards / 50 grams

20820 projects

stashed 17045 times

SkippyRabbit's star rating
About this yarn
by Knit Picks
Fingering
75% Cotton, 25% Acrylic
218 yards / 50 grams

11808 projects

stashed 10452 times

SkippyRabbit's star rating
  • Project created: April 1, 2014
  • Updated: June 21, 2014
  • Progress updates: 7 updates