Bicycle Bobble Blanket
Finished
July 29, 2023
April 8, 2025

Bicycle Bobble Blanket

Project info
Bicycle Bobble Blanket by Martha Fitch
Crochet
BlanketThrow
Mum
Hooks & yarn
5.0 mm (H)
1,292 yards
Big Twist (Jo-Ann) Value Solids
1.58 skeins = 601.3 yards (549.8 meters), 269 grams
Gray
Big Twist (Jo-Ann) Value Solids
1.67 skeins = 634.8 yards (580.5 meters), 284 grams
634876
Purple
Lion Brand Pound of Love
717 yards in stash
0.06 skeins = 56.2 yards (51.4 meters), 25 grams
51597
White
Joann's
August 26, 2023
Notes

Total time to complete: 4726 min = 78 hrs & 46 min (over the course of 1 yr & 5 mon)

Total size (rough measure): 70 x 70 in = 177 x 177 cm

• 11/11/23 : Finished first bike strip
• 12/20 : Restarted completely. Completed R1-2 (99m)
Started with 246 Foundation DC, which is 6 repeats

Changes : doing DC stitches & TC Bobbles (bobbles ending w/4 loops on the hook, 3 of which are unclosed TC) instead of SC stitches & DC bobbles. Doing a Stacked SC for the turning chain/first DC of each row.

• 12/24 : Had to redo R2 (made too many FDC), + completed 1st repeat of R3 (47m)
• 12/25 : Completed R3-4 (54m)
• 12/26 : Completed R5 (36m)
• 12/28 : Frogged R4-5 .. Re-did R4-5 + 6-8 (142m)

Changes : Rows between bobble rows will be HDC instead of DC. Starting stitch will still be Stacked SC instead of turning chain.

• 12/29 : Completed R9-10 (54m)
• 12/31 : Completed R11-14 (115m)
• 1/1/24 : Completed 3 repeats on R15 (22m)
• 1/2 : Completed R15-16 (42m)
• 1/3 : Completed R17-18 (62m)

Thinking ahead .. original pattern has a DC row of accent color between bicycle stripes, since I’m upping the other stitch sizes, maybe I’ll make it a Linked TR row instead.

• 1/6 : Completed R19 (24m)
• 1/13 : Completed 4 repeats of R20 (15m)
• 1/18 : Completed R20-24 (104m)
• 1/19 : Completed R25 (27m)
• 1/20 : Completed R26-27. First stripe complete. (39m)
First stripe is 23cm tall (w/o accent row). Used approx. 601.3y/549.8m/269g of grey.

• Decided on using a Forked Cluster stitch (FC) for the accent rows. I tried the Linked TR and it was too dense, but a reg TR was too loose.

Accent row used 56.2y/51.4m/25g of white.
• 1/22 : Completed R28, the FC accent row (60m)
Completed R29-33 (the start of the 2nd color stripe - purple) - had to frog 2 rows b/c I added a st somewhere (109m)
Redid R32 (26m)
• 1/27 : Completed half of R33 (20m)
• 1/30 : Completed R33-35 (60m)
• 1/31 : Completed R36 (16m)
• 2/6 : Completed R37-40 (103m)
• 2/10 : Started R41 (10m)
• 2/14 : Completed R41, started R42 (25m)
• 2/15 : Completed R42 (20m)
• 2/16 : Started R43 (15m)
• 2/18 : Completed R43, started R44 (20m)
• 2/20 : Completed R44-48 (115m)
• 2/21 : Completed R49-50, started R51 (63m)
• 2/23 : Completed R51-55. 2nd stripe is complete. (108 m)
Stripe 2 used approx. 634.8y/580.5m/284g of purple
• 2/25 : Completed 2nd FC Accent Row - First repeat complete. (43m)
Start of 2nd Repeat : Completed R1-2 (41m)
• 2/26 : Started R3 (22m)
• 3/1 : Completed R3-6 (63m)
• 9/28 : Completed R7-9 (150m)
• 9/29 : Completed R10 (21m)
• 10/15 : Started R11 (12m)
• 10/20 : Completed R11-12 (43m)
• 10/21 : Completed R13-14 (45m)
• 10/22 : Completed R15 (41m)
• 10/23 : Completed R16 (30m)
• 10/26 : Started R17, finished 3 repeats, frogged back to half way of R16 b/c missed st. Completed R16 (32m)
• 10/27 : Completed R17-20 (112m)
• 11/2 : Completed R21 (40m)
• 11/3 : Completed R22 (24m)
• 11/5 : Completed R23 (30m)
• 11/6 : Completed R24 (20m)
• 11/7 : Started R25 (5m).
Ran out of Soft grey, will have to order more to continue.
• 11/15 : Completed R25-27. 1st Stripe of 2nd repeat complete. (68m)
• 11/16 : Completed R28 (FC accent row) (44m)
• 11/17 : Completed R29-30 (start of next stripe 2 of 2nd repeat) (44m)
• 12/11 : Completed R31-33 (99m)
• 1/4/25 : Completed R34-36 (75m)
• 1/6 : Completed R37-38 (64m)
• 1/10 : Completed R39-40 (62m)
• 1/22 : Completed R41-42 (51m)
• 2/1 : Completed R43-44 (65m)
• 2/2 : Completed R45-46 (58m)
• 2/5 : Completed R47-48 (49m)
• 2/6 : Worked on R49 (22m)
• 2/8 : Completed R49-50 (30m)
• 2/9 : Completed R51-54 (94m)
• 2/10 : Completed R55 - 2nd stripe of 2nd repeat complete (17m)
• 2/22 : Completed R56 (accent row).
— Started 3rd (and last) repeat. Completed R1-2 (69m)
• 3/1 : Completed R3-6 (96m)
• 3/4 : Completed R7-8 (48m)
• 3/5 : Completed R9-11 (87m)
• 3/6 : Completed R12 (18m)
• 3/7 : Completed R13-14 (54m)
• 3/8 : Completed R15 (38m)
• 3/9 : Completed R16-17 (52m)
• 3/15 : Completed R18-19 (45m)
• 3/16 : Completed R20-24 (111m)
• 3/17 : Completed R25-27 (62m) - 1st stripe of last repeat done.
• 3/23 : Completed R28 (FC accent row) (36m)
• 3/31 : Started 2nd stripe of last repeat. Completed R29-34 (135m)
• 4/1 : Completed R35-38 (102m)
• 4/2 : Completed R39-40 (49m)
• 4/5 : Completed R41-45 (130)
• 4/6 : Completed R46-50 (117m)
• 4/7 : Completed R51-55 (104m)
Last strip done. Body of blanket done.
— I made R54 DC, and R55 HDC to kinda of match the FDC of R1.
• 4/8 : Did 1 round of SC border (105m)
— PROJECT COMPLETE!

viewed 0 times
Finished
July 29, 2023
April 8, 2025
About this pattern
10 projects, in 12 queues
Dandyserendipity's overall rating
Dandyserendipity's clarity rating
Dandyserendipity's difficulty rating
About this yarn
by Lion Brand
Worsted
100% Acrylic
1020 yards / 454 grams

48069 projects

stashed 17824 times

Dandyserendipity's star rating
About this yarn
by Big Twist (Jo-Ann)
Aran
100% Acrylic
380 yards / 170 grams

25921 projects

stashed 25088 times

Dandyserendipity's star rating
  • Project created: August 5, 2023
  • Finished: April 8, 2025
  • Updated: April 14, 2025