Irish Sweaterish
Finished
November 8, 2015
November 27, 2015

Irish Sweaterish

Project info
Design B - Cabled Sweaters with Round Neck or Hood by Sirdar
Knitting
SweaterPullover
Brighton
Needles & yarn
Berroco Vintage® DK
none left in stash
2 skeins = 576.0 yards (526.7 meters), 200 grams
Gray
Hidden River Yarns
Notes

Doing the sleeves on the machine and the body by hand.

Sleeves:
Stitch dials set to 12, auto tension disks set to 11. Tubular cast on (waste yarn/ravel cord method).
Shoulder shaping: dec’d 6 each row for 6 rows, then dec 4 for 2 rows.

11-17-2015

Started doing the body, and decided to knit it in the 3-4 size because the kid it’s going on is big for his age. It’s coming out large (I should have measured him) but I’d rather he grow into it than have it start too small.

I modified the pattern to do the body in the round. CO 164 stitches, working in the round for 7.75” before I divide the front and back for the arm holes.

11-22-2015

Worked the front and back as written after dividing for the arm holes. Knit the neckband in the round, picking up two additional stitches from the back in order to get a number that was divisible by 4 for the 2x2 rib.

Decided to do the sleeves by hand after all.

11-23-2015

Knitting the sleeves two-at-a-time in the round on magic loop. CO 44 stitches for each sleeve (had to add two so the rib would line up) and then skipped the increase in the last row of ribbing. Will increase as written until 62 stitches (rather than the 63 specified in the pattern).

11-27-2015

Done! Still needs blocking, but overall really happy with how it came out. Had a very small amount of yarn left. Wasn’t quite playing yarn chicken, but only have about 10 grams leftover.

viewed 34 times
Finished
November 8, 2015
November 27, 2015
About this pattern
84 projects, in 85 queues
kellbot's overall rating
kellbot's clarity rating
kellbot's difficulty rating
About this yarn
by Berroco
DK
52% Acrylic, 40% Wool, 8% Nylon
290 yards / 100 grams

26474 projects

stashed 15509 times

kellbot's star rating
  • Project created: November 8, 2015
  • Updated: November 27, 2015
  • Progress updates: 5 updates