Linen Stitch Bubble Scarf
Finished
September 27, 2015
October 23, 2015

Linen Stitch Bubble Scarf

Project info
Cerus Scarf by Hilary Smith Callis
Knitting
Neck / TorsoScarf
Noni
Needles & yarn
US 8 - 5.0 mm
483 yards = 1.77 skeins
Malabrigo Yarn Worsted
105 yards in stash
1.23 skeins = 315.0 yards (288.0 meters), 123 grams
Purple
Craftsy.com
September 16, 2015
Malabrigo Yarn Worsted
42 yards in stash
0.54 skeins = 168.0 yards (153.6 meters), 54 grams
White
Craftsy.com
September 16, 2015
Notes

As done by dona-knits, 3 skeins for bubble effect.

09-28-2015

This yarn is amazing, it feels wonderful and knits easily, which is good because I probably cast on a bit too tightly. I always seem to do that.

10-02-2015

Had to frog and start over. First time knitting flat on circulars, I overthought it and started one of my skeins on the wrong side. Didn’t figure it out until I realized I was working WS 2 times in a row and the RS didn’t look quite right. Thankfully I was only on row 6. Finished row 3 last night, now that I have the pattern down I’ve speeded up quite a bit. I’d love to have this finished in 2 weeks or less. Got too many things to do before Christmas!

10-09-2015

Not going as quickly as I’d hoped. The knit rows fly by but I’m so slow at purling. I continue to be unable to grasp either Continental or English styles. Oh well, I’m still loving how this is turning out.

10-11-2015

So far I’m 25 hours in and 39 rows complete. I estimate it’ll be finished at about 80 rows. If I keep to my current pace I might actually make my 2 week deadline! (not counting the bad start)

I increased the pattern’s difficulty rating to medium because of the denseness of the fabric and the frustration of constantly juggling 3 skeins. I also bumped the yarn down to 4 stars because it’s fuzzing more than I thought it would and splits too easily. I’m constantly stopping to drag one tiny fiber off the needle and put it back with the thread.

10-19-2015

One morning I just magically mastered flicking like I’d been doing it all along. Crazy how that goes. I cut my time per row in half so I feel like progress is better but my available knitting time was reduced this week. Lots of compliments on how it’s turning out but I’m so ready to be done!

~38 hours, 64 rows.

10-24-2015

48 hours approx to knit. Did not count weaving ends or blocking time. About half way through I figured out the secret to faster knitting so my time isn’t representative for an experienced knitter.

viewed 186 times
Finished
September 27, 2015
October 23, 2015
About this pattern
2440 projects, in 3946 queues
BKlamer's overall rating
BKlamer's clarity rating
BKlamer's difficulty rating
About this yarn
by Malabrigo Yarn
Aran
100% Merino
210 yards / 100 grams

157663 projects

stashed 86885 times

BKlamer's star rating
  • Originally queued: September 16, 2015
  • Project created: September 28, 2015
  • Finished: December 1, 2015
  • Updated: December 26, 2015
  • Progress updates: 12 updates