Completed for the Outfit Along 2015. I finished the cardigan by the deadline, but not the dress.

When picking up stitches for the sleeve, pick up a stitch in every other stitch, including along the stitches for the underarm. Normally you should pick up a stitch for every stitch along a horizontal edge, but doing that will result in too many picked up stitches. I picked up and tore out stitches too many times to count before I figured this out.

I changed the paired decreases so that they always pointed toward the “seams” instead of away in some places.

For the bottom band, I started Stitch Patterns C and D on row 4 instead of row 2 so that the cables crossed later than specified to align with the pattern set by prior crosses.

I made yarnover buttonholes.

I used the Lace Bind Off on the neckline/buttonband; I used the Elastic Bind Off on the cuffs and hem so that they stretched sufficiently, but knit them very firmly since it flared if knit too loosely.

I don’t love the large wrinkle I get pointing toward the bust when I bend my elbows away from my body, but otherwise the fit is good and complements the dress splendidly.

Progress

06/01/2015 - Realized I did not own US 9 needles, so rushed out to buy circulars and DPNs.

06/02/2015 - Swatched with US 9.

06/03/2015 - Discovered that going up one needle size wasn’t enough (seriously?!) and switched to US 10 for another swatch.

06/05/2015 - Cast on back.

06/06/2015 - Started right front.

06/07/2015 - Finished right front.

06/08/2015 - Started left front.

06/10/2015 - Joined fronts and back.

06/20/2015 - Knit to bottom band. Discovered an error in my final cable repeat on both sides: I made the cable travel too soon, so it isn’t positioned correctly to flow neatly into the bottom band.

06/22/2015 - Fixed the cables and knit the bottom band.

07/03/2015 - Started first sleeve.

07/23/2015 - Started second sleeve.

07/27/2015 - Blocked.

07/29/2015 - Sewed on the buttons. Done!

viewed 118 times | helped 5 people
Finished
June 2, 2015
July 29, 2015
About this pattern
372 projects, in 671 queues
Dreamsong's overall rating
Dreamsong's clarity rating
Dreamsong's difficulty rating
About this yarn
by Stonehedge Fiber Mill
Aran
100% Merino
250 yards / 113 grams

23385 projects

stashed 15153 times

Dreamsong's star rating
  • Project created: June 7, 2015
  • Finished: September 10, 2015
  • Updated: January 6, 2016
  • Progress updates: 2 updates