Ravelympics 2010 WIPs Dancing project
I haven’t worked on this since September! Hopefully I’ll make a good dent in it while watching the winter games! :o)
2/12/10: Project was stalled at sleeve cap, finished sleeve cap during opening ceremony.
2/13/10: Cast on back
2/14/10: 6” done on back, slow going since I’m not feeling so hot
2/19/10: 17” done on the back, attempting to work on it a few hours a day. Who had the bright idea to put the Olympics in the middle of tax season, anyway? ;o)
2/21/10: Back is done! Knitting the two fronts at the same time, cast those on last night and have 3” done so far!
2/28/10: Two fronts are done! I still need to knit the other sleeve, block, seam and knit the button band and collar so I didn’t get the gold but I enjoyed my Olympic experience! (it probably helps that I have an Olympic sweater from four years ago) ;o)