Cables, Bobbles and a little bit of lace
Finished
February 2015
March 2015

Cables, Bobbles and a little bit of lace

Project info
117-18 Alaska Cables by DROPS design
Knitting
SweaterPullover
me
S
Needles & yarn
US 8 - 5.0 mm
Garnstudio DROPS Loves You 4
12 skeins = 984.3 yards (900.0 meters), 600 grams
Notes

Adapted the pattern for the Drops loves you #4 yarn, drops yarngroup C, Aran weight yarn (gauge with 5mm needles 16st/22rows=10cm) and made it about 10cm shorter.

Of you’re interested here are the changes/ new instructions:

Front:
CO 75 with 4mm needle.
1 edge st, k3, p4, end with k3 and edge stich.
Repeat for 4 cm.
Then p2tog in every purl section (make 3 purl stiches out of those 4) = 65 sts.
Keep on ribbing until there’s 8 cm, change to 5mm needles.

1 edge st, k11, k2 (garter), p4, k2 in every st for the next 4 sts, p3, k3, p9, k3, p3, k2 in every st for the next 4 sts, p4, k2 (garter), k11, 1 edge st. (8 sts increased = 73 sts)
Next RS-row:
1 edge st, k11, k2 (garter), p4, pattern M1 (but knit it over 8 sts instead of 6), pattern M2a (=21sts), pattern M3 (again over 8 sts instead of 6), p4, k2 (garter), k11, 1 edge st.

Continue in pattern (cable M1 and M3 over 8 sts instead of 6 sts), Repeat pattern M2b 2 times vertically.
At the same time decrease while k2tog after/before edge stich on both sides. Decrease 2 sts after 20cm, 25cm, 28cm and 30 cm. (8sts decreased)
Increase while kfb after 40cm, 42cm, 44cm, 46cm, 48cm. (10sts increased)

Armhole shaping: After 52,5cm BO at beginning/end of row: 3 sts once, 2sts twice and 1 st once.

Neckline shaping: After finishing M2c (ca. 58cm), put middle 21 sts onto a holder and finish each side seperately. Continue with cable pattern.
K3tog on each side of neckline in everey 2nd row 3 times.

BO remaing sts after 72cm.

Back:
With 4 mm needles cast on 76 sts.
1 edge stich, repeat p4, k3, 1 edge stich.
Repeat for 4 cm.
Then p2tog in every purl section (make 3 purl stiches out of those 4) = 65 sts.
Keep on ribbing until there’s 8 cm, change to 5mm needles.
Now continue in stockinette. In the first row decrease 4 sts evenly. (=61 sts)

Like for the front part: Decrease while k2tog after/before edge stich on both sides. Decrease 2 sts after 20cm, 25cm, 28cm and 30 cm. (8sts decreased)
Increase while kfb after 40cm, 42cm, 44cm, 46cm, 48cm. (10sts increased) (=63 sts)

Armhole shaping: After 52,5cm BO at beginning/end of row: 3 sts once, 2sts twice and 1 st once.

Neck: When there’s ca. 3cm left (after 69cm), put middle 21 sts onto a holder and finish each side seperately. In the next row cast of 1 more stich on each side of the neck. Then finish until piece measures 72cm and bind of remaining stiches. Do the same for the other side.

Sleeves:
With 4mm needle, CO 32 sts.
1 edge stich, repeat k3, p3, 1 edge stich.
Repeat for 12 cm. Change to 5mm needle and continue in stockinette.
In the first row of stockinette, decrease by 3 sts evenly. (=29sts)
After 14 cm kfb at beginning and end of row. (adding 2 sts in this row)
Repeat every 4 cm 8 times total. (=45sts)

After about 40cm, I started incorporating the diamond in the middle of the sleeve. (see chart in pictures)

Shoulder shaping:
After 47 cm bind off 6 sts at beginning of row. Repeat for next row.
Then bind off 3 sts at beginning of following row. Repeat for next row.
Now decrease 1 st at beginning and end of every row until sleeve measures 54cm.
Then bind of 6 sts on both sides of the next row. Bind off remaining sts when sleeves measures 56 cm.

Neck:
I picked up 90 sts around the neck (some of which were on hold) and started ribbing (k3, p3).
After 10cm I increased to k4, p3 and after 20cm to k5, p3.
BO after 25cm.
(This is actually simply what the original instructions say.)

You can find the blog post about this sweater HERE.

viewed 213 times | helped 3 people
Finished
February 2015
March 2015
 
About this pattern
65 projects, in 223 queues
drizzleofhoney's overall rating
drizzleofhoney's clarity rating
drizzleofhoney's difficulty rating
About this yarn
by Garnstudio
Aran
55% Alpaca, 40% Wool, 5% Linen / Flax
82 yards / 50 grams

1246 projects

stashed 923 times

drizzleofhoney's star rating
  • Project created: February 7, 2015
  • Finished: March 25, 2015
  • Updated: June 17, 2015
  • Progress updates: 3 updates