acer
Finished
February 25, 2013
January 19, 2014

acer

Project info
Acer Cardigan by Amy Christoffers
Knitting
SweaterCardigan
warmth
38
Needles & yarn
US 7 - 4.5 mm
Brooklyn Tweed Shelter
70 yards in stash
7.5 skeins = 1050.0 yards (960.1 meters), 375 grams
03.1150
Brown
Knit Purl in Portland, Oregon
Notes

Full write-up is on the blog!

PROJECT NOTES:

I adore this pattern and made only the tiniest of tweaks.

  • Knitted the Shelter on US7 to get gauge. All of the ribbing was worked on the 7s, as well.

  • Matching my favorite cardigan, worked body to 13” before dividing for front and back; sleeves are 19” long.

  • Only did minimal waist shaping: one decrease on 21st pattern row and one increase on 41st.

  • For the sleeves, I cast on 40 sts and increased to 44 at the end of (3”) ribbing

  • Picked up 79 sts for the left button band — 2 stitches per 3 rows. Didn’t like that there were only 2 knits at the top of that band (since that only leaves one once you pick up for the neck) so picked up an additional stitch at the top of the right band. (Making sure the first 79 sts aligned with the ones on the opposite band.)

  • Worked 10 rows for the button bands instead of 8.

  • Did 7 buttonholes instead of 6 — 2yo buttonholes, worked on the 4th/5th rows; worked into the hole on the 6th row. 20mm horn buttons from Fringe Supply Co.

  • Picked up 102 sts for the neck, worked 9 rows before BO. (Note that the neck numbers given in the pattern are incorrect: needs to be a multiple of 4, plus 2.)

Only used 7.5 skeins of yarn!

viewed 4883 times | helped 26 people
Finished
February 25, 2013
January 19, 2014
About this pattern
946 projects, in 2646 queues
karentempler's overall rating
karentempler's clarity rating
karentempler's difficulty rating
About this yarn
by Brooklyn Tweed
Worsted
100% Targhee-Columbia
140 yards / 50 grams

33517 projects

stashed 20837 times

karentempler's star rating
  • Project created: April 11, 2013
  • Finished: January 23, 2014
  • Updated: January 19, 2015
  • Progress updates: 5 updates