Teal Workhorse
Finished
January 8, 2016
March 26, 2016

Teal Workhorse

Project info
Schnee by SuviKnits
Knitting
SweaterCardigan
me
138 stitch version
Needles & yarn
US 5 - 3.75 mm
Garnstudio DROPS Lima
655 yards in stash
18 skeins = 1969.2 yards (1800.6 meters), 900 grams
Blue-green
Lanade
January 5, 2016
Notes

This will be replacement for my beloved outdoor fleece jacket.
Good old fleece jacket can rest in peace now:-)

Im very fond of Drops Lima, because the yarn is very durable. Knitted an afghan for my daughter once, which is definetely not treated with care and still looks like new.

I used a smaller needle, because I wanted a dense fabric for an outdoor cardi.
Gauge was slightly smaller. Since I am a size 14/16 girl, a cardi with too much ease would look like a tent and therefore is not an option. I decided for the 137cm version which (according to my calculations) would create a cardigan with 15cm ease instead of 25cm.

28.01.2016

Body is finished. Size and length perfect!

Button band will be done later. Sleeves first.
Sleeves are the critical part in terms of size. I hate sleeves with little ease and might follow the instructions for size 40 sleeves (24 instead of 34 decreases: 84 down to 60 stitches instead of 50).This will hopefully create a wider sleeve suitable for an outdoor jacket.

30.01.2016

Plan B for sleeves: no decreases at all down to elbow. Upper arm circumfence is 32 cm, sleeve starts with 39.

31.01.2016

Started with 84 stitches.
Sleeve: 68 rows after garter rows without decrease.

Decrease every 8 row as stated.
R 69 dec
R 70-76 knit
R 77 dec
R 78-84 knit
R 85 dec
R 86-93 knit
R 94 dec
R 95-100 knit
R 101 dec
10 stitches decreased. 74.

Decrease every 6 row as stated.
R 102-107 knit

03.02.2016

R 108 Dec
R 109-113 knit
R 114 Dec
R 115-119 knit
R 120 Dec
R 121-125 knit
R 126 Dec
R 127-131 knit
R 132 Dec (64 stitches)
R133-137 knit
R 138 Dec
R 139-143 knit
R 144 Dec (60)

05.02.2016

Start sleeve ribbing at Row 145.
15 rows. Normal bind off in ribbing.

08.02.2016

Dito sleeve two.

Done.

07.03.2016

Stitches for button band were picked up and stitches were arranged in 2/2 ribbing by Anke.

Now I would be ready to go to finish the button band … yet the buttons are still in the mail.

26.03.2016

Button band knitted with 3.5. 6 button holes.

02.04.2016

Had to shorten sleeves. Picked up at 72 stitches with needle 3.0, started with ribbing straight away and continued with decreases every 4th row down to 64 stitches plus 6 more even rows.

viewed 999 times | helped 4 people
Finished
January 8, 2016
March 26, 2016
 
About this pattern
345 projects, in 1002 queues
knittinghun's overall rating
knittinghun's clarity rating
knittinghun's difficulty rating
About this yarn
by Garnstudio
DK
65% Wool, 35% Alpaca
109 yards / 50 grams

37177 projects

stashed 19992 times

knittinghun's star rating
knittinghun's adjectives for this yarn
  1. soft
  2. durable
  3. good stitch definition
  • Project created: January 28, 2016
  • Finished: March 25, 2016
  • Updated: April 5, 2016
  • Progress updates: 5 updates