Camel meets Lama
Finished
November 11, 2024
March 11, 2025

Camel meets Lama

Project info
Eri by Isabell Kraemer
Knitting
SweaterPullover
myself
4/5
Needles & yarn
US 3 - 3.25 mm
US 4 - 3.5 mm
22 stitches and 33 rows = 4 inches
in stockinette stitch
1,361 yards = 8.3 skeins
Lana Grossa Natural lama fine
1264 yards in stash
8.3 skeins = 1361.5 yards (1245.0 meters), 415 grams
woll.werk in Krems, Niederosterreich
November 4, 2024
Notes

Body:
3.5mm needles: front pattern repeat per row:
1x chart A, 1x chart B, 1x chart C3, 1x chart D, 1x chart A
added 1cm extra length before sleeve separation
74sts. per sleeve on hold
CO 2x5 underarm sts. per side = total 129sts. per side.
length from underarm to ribbing 40cm
Switched to 3.25mm needles, arranged the front sts. for my 2/2 ribbing. Will knit 6cm of ribbing = totalling 46cm from underarm to bottom (total of 248sts.)
Sleeves:
added 2x6 underarm sts. = 74sts. + 12 = 86sts.
Started decreases after 6cm - 2 sts. every 7th row.
down to 56sts. After 38cm from underarm 24 rows of ribbing on 3.25mm needles
————————
Neck with 3.25mm needles: picked up 108sts. for 6 rows of 2/2 ribbing. Reduced 2x4sts. during BO.

—————————-
Magic loop for sleeves https://youtube.com/shorts/PRuIoWNALHk?si=YJRcMlvCAJt2Ndg-

viewed 268 times | helped 1 person
Finished
November 11, 2024
March 11, 2025
 
About this pattern
Eri
883 projects, in 1845 queues
mosil1949's overall rating
mosil1949's clarity rating
mosil1949's difficulty rating
About this yarn
by Lana Grossa
Sport
100% Llama
164 yards / 50 grams

64 projects

stashed 57 times

mosil1949's star rating
  • Originally queued: November 4, 2024
  • Project created: November 11, 2024
  • Finished: March 11, 2025
  • Updated: April 27, 2025
  • Progress updates: 8 updates