Camp Loopy Project 2
Finished
June 27, 2012
July 15, 2012

Camp Loopy Project 2

Project info
Houndstooth Bandana by Jocelyn Tunney
Knitting
Neck / TorsoScarf
Carly
One Size
Needles & yarn
US 5 - 3.75 mm
817 yards = 5.6 skeins
Blue Sky Fibers Alpaca Silk
15 yards in stash
1.9 skeins = 277.4 yards (253.7 meters), 95 grams
138
3596
Red
The Loopy Ewe in Loveland, Colorado
June 16, 2012
Blue Sky Fibers Alpaca Silk
none left in stash
1.87 skeins = 273.0 yards (249.6 meters), 93 grams
120
0927
Natural/Undyed
The Loopy Ewe
June 16, 2012
Blue Sky Fibers Alpaca Silk
25 yards in stash
1.83 skeins = 267.2 yards (244.3 meters), 91 grams
150
8251
Black
The Loopy Ewe
June 16, 2012
Notes

7/2: Ok, so I struggled with picking up the stitches along the border and thought I would try to describe how I did it. First of all it says in the directions to not pick up the slipped stitches. This is because it will not give you enough stitches, you have to pick up 336 and I could get about half of that. So I picked up the bars between the slipped stitch and the next stitch which allowed me to get 336 (see photo.) The challenge with this is that I couldn’t pick up stitches before casting on. So I placed a stitch marker at the half way point then counted 168 in each direction and placed stitch markers. Then I picked up and knit the first WS row as directed. This made a beautiful transition from the top border to hounds tooth pattern. I hope this helps as I fought with this for awhile.

6/30: The hounds tooth section threw me for a loop for a few rows and I considered ripping it out but then I went back and took the time to compare the pattern to my knitting I was FINALLY able to figure it out, now I’m going strong!

6/29: I finished the Top Border Strip today, now to get started on the houndstooth section. I love running this through my fingers, it feels delicious.

viewed 235 times | helped 7 people
Finished
June 27, 2012
July 15, 2012
 
About this pattern
from O-Wool
24 projects, in 228 queues
mostedgaard's overall rating
mostedgaard's clarity rating
mostedgaard's difficulty rating
About this yarn
by Blue Sky Fibers
Sport
50% Silk, 50% Alpaca
146 yards / 50 grams

10403 projects

stashed 11019 times

mostedgaard's star rating
  • Originally queued: June 12, 2012
  • Project created: June 27, 2012
  • Updated: July 15, 2012
  • Progress updates: 3 updates