helt barockt
Finished
October 2, 2020
October 25, 2020

helt barockt

Project info
Barocco by Stella Egidi
Knitting
SweaterPullover
myself
XL -﹥ L
Needles & yarn
US 3 - 3.25 mm
US 4 - 3.5 mm
US 5 - 3.75 mm
US 6 - 4.0 mm
21 stitches and 28 rows = 4 inches
in stockinet
1,338 yards = 5.32 skeins
Fyberspates Vivacious DK
48 yards in stash
0.82 skeins = 206.3 yards (188.6 meters), 94 grams
454665
Purple
Wool Warehouse
September 4, 2020
Fyberspates Vivacious DK
3 yards in stash
4.5 skeins = 1131.9 yards (1035.0 meters), 517 grams
215199
Red-purple
Wool Warehouse
September 4, 2020
Notes

General
MC Plump Imps, CC Crocus

My gauge is a bit off so I’m casting on for XL in the hope of achieving L.

Note to self: Sleeve gauge even more off despite using larger needles, 22x31. Next time knitting sweater try needles two sizes larger!

Using 3.75mm needles for yoke & body & ribbing on body, 3.25 for neck ribbing, 4 for sleeves, and 3.5 for sleeve ribbing.

Using Grumperina's method for cabling without a cable needle.

Using TECHknitter’s trick for a neater transition from stockinet to ribbing.

TCKAL cast-on post: #85

Mods

  • started on yoke immediately after provisional cast-on,
  • knit CDD like this: slip2togkwise, slip1kwise, k3togtbl, made bobbles 1 r smaller,
  • picked out provisional CO and knit 5 r twisted rib decreasing 20 st on the first r,
  • short rows as pattern and then started alternating skeins,
  • using lifted increases in increase section & for body shaping,
  • used provisional CO for the underarm stitches,
  • sleeves knit 30 r before starting decreases, decreased every 12th r six times + every 6th r five times + 12 r stockinet before changing to CC, cuff 1 r + 5 r twisted rib,
  • knit body increases and length as pattern but bottom ribbing 5 r.

Timeline
2020-10-06: Finished yoke. Separated sleeves and continued on body.
2020-10-09: Taking a break from the body to knit the sleeves, starting with the left one.
2020-10-11: Sleeve is tapering too quickly so frogged and started over.
2020-10-14: Finished left sleeve.
2020-10-15: Started on right sleeve.
2020-10-18: Finished right sleeve and continued on the body.
2020-10-25: Finished!

viewed 207 times | helped 1 person
Finished
October 2, 2020
October 25, 2020
 
About this pattern
101 projects, in 477 queues
turloughishere's overall rating
turloughishere's clarity rating
turloughishere's difficulty rating
About this yarn
by Fyberspates
DK
100% Merino
252 yards / 115 grams

3518 projects

stashed 2602 times

turloughishere's star rating
  • Originally queued: September 5, 2020
  • Project created: October 2, 2020
  • Updated: October 28, 2020
  • Progress updates: 22 updates