Dusk in the Forest
Finished
May 19, 2016
June 24, 2016

Dusk in the Forest

Project info
Deep in the Forest Mittens by Tuulia Salmela
Knitting
HandsMittens
Aunt S
Needles & yarn
US 1 - 2.25 mm
US 1½ - 2.5 mm
US 2 - 2.75 mm
409 yards
Austermann Merino Lace (OLD)
301 yards in stash
0.48 skeins = 183.2 yards (167.5 meters), 12 grams
7
20423
Red
Systrarna i Nybro
May 24, 2016
Holst Garn Supersoft
none left in stash
0.36 skeins = 113.0 yards (103.3 meters), 18 grams
Purple
Holst Garn
January 13, 2016
Holst Garn Supersoft
314 yards in stash
0.36 skeins = 113.0 yards (103.3 meters), 18 grams
62433
Black
Holst Garn
February 19, 2016
Notes

General
Why can I never remember how to move the yarn when making Latvian braids?!! I always have to look it up to be sure.
I love this pattern! Every row is different, I never grow bored :-)

Mods

  • 2.25mm needles for the cuff & Latvian braid and for the lining, 2.5mm for the colourwork, 2.75mm for the thumb.
  • Used crocheted provisional cast-on since I’m planning to line these with laceweight yarn.
  • Made a picot edge instead of the plain purled round.
  • Since I’m going to line these I’m not bothering with trapping longer floats. Just checking that they’re not too tight.
  • Using lifted increases and ssk insted of skpsso for the first decrease.
  • Changed the top of the mitten a little: did one more decrease round and then one round k2tog, cut yarn and threaded through remaining stitches.
  • Changed the thumb decreases a bit. Ended it as I did the mitten.

Timeline
2016-05-29: Grrr! The thumb is too small. I knew I should have used larger needles. Will have to unravel and reknit tomorrow.
2016-05-30: Started over on the thumb with larger needles.
2016-05-31: Even more grrr! The whole mitten except the cuff is too tight for the recipient. Unraveled all the colourwork (down to the Latvian braid) and started over on larger needles.
2016-06-08: Finally finished the first mitten (except the lining). Knitted the cuff on the second mitten.
2016-06-09: Started on the lining for the first mitten.
2016-06-11: Started on the colourwork for the second mitten.
2016-06-19: First mitten completely finished!
2016-06-21: Finished the colourwork on the second mitten and started on the lining.
2016-06-24: Finished lining of second mitten. Soaked and blocked and waiting for them to dry.

viewed 162 times
Finished
May 19, 2016
June 24, 2016
 
About this pattern
504 projects, in 2665 queues
turloughishere's overall rating
turloughishere's clarity rating
turloughishere's difficulty rating
About this yarn
by Holst Garn
Light Fingering
50% Merino, 50% Shetland
314 yards / 50 grams

35382 projects

stashed 36525 times

turloughishere's star rating
About this yarn
by Austermann
Lace
100% Merino
383 yards / 25 grams

793 projects

stashed 877 times

turloughishere's star rating
  • Originally queued: January 13, 2016
  • Project created: May 19, 2016
  • Finished: June 25, 2016
  • Updated: May 9, 2024
  • Progress updates: 21 updates