Gråväder
Finished
February 15, 2018
April 23, 2018

Gråväder

Project info
Jón by Hulda Hákonardóttir
Knitting
SweaterPullover
Brother-in-law J
XXL+
Needles & yarn
US 6 - 4.0 mm
US 7 - 4.5 mm
17.5 stitches and 25 rows = 4 inches
in stockinet
1,516 yards = 13.87 skeins
Ístex Léttlopi
61 yards in stash
1.44 skeins = 157.5 yards (144.0 meters), 72 grams
9433
Gray
Kaki AB
February 8, 2018
Ístex Léttlopi
27 yards in stash
1.39 skeins = 152.0 yards (139.0 meters), 69 grams
9579
Gray
Kaki AB
February 8, 2018
Ístex Léttlopi
66 yards in stash
2.4 skeins = 262.5 yards (240.0 meters), 120 grams
9557 & 9896
Gray
Kaki AB
February 8, 2018
Ístex Léttlopi
none left in stash
8.64 skeins = 944.9 yards (864.0 meters), 432 grams
9669
Black
Kaki AB
February 8, 2018
Notes

General
With needles this large my tighter gauge at small circumferences isn’t enough to warrant the use of a larger size for the sleeves. The same goes for the stranded colourwork.

Used shortrows from Telja to rise shoulders and neck.

TCKAL cast-on post: #1077

Mods

  • started with the sleeves,
  • sleeve ribbing 14 r,
  • trying out catching floats on the round after and it’s working quite well with these short repeats, cathing floats for more than 3 st on sleeves & hem and for more than 5 on yoke,
  • using lifted increases,
  • did 20 increases on sleeves = 88 st, knit 1 more r after finishing incr = 54 cm, put 18 st on holder = 70 st left,
  • cast on 222 st for body (18 st extra), ribbing 12 r, increase 1 st in each side after chart 1 = 224 st, put 3 st extra on each holder = 14 st extra for yoke (with the 10 st extra from the sleeves this made 3 more pattern repeats) = 328 st for yoke,
  • used German shortrows (double stitch) to rise shoulders and neck 3 pairs before and 3 pairs after joining sleeves,
  • joining sleeves after 50 cm,
  • used dark grey instead of black for middle and end of yoke pattern + neck,
  • k1 k2tog all through first row after finishin yoke pattern = 82 st left,
  • neck ribbing 8 r.

Tmeline
2018-02-28: Finished first sleeve and started second.
2018-03-04: Finished second sleeve and started on body.
2018-03-15: Joined sleeves to body and started yoke.
2018-03-31: Ran out of dark grey yarn, grrr!
2018-04-05: Yarn has arrived.
2018-04-07: Finished yoke. Only neck ribbing left but will wait until he has tried it on.
2018-04-23: Finally finished the knitting!

viewed 133 times | helped 1 person
Finished
February 15, 2018
April 23, 2018
 
About this pattern
472 projects, in 541 queues
turloughishere's overall rating
turloughishere's clarity rating
turloughishere's difficulty rating
About this yarn
by Ístex
Aran
100% Icelandic
109 yards / 50 grams

56500 projects

stashed 53586 times

turloughishere's star rating
  • Originally queued: January 30, 2018
  • Project created: February 15, 2018
  • Finished: April 25, 2018
  • Updated: May 9, 2024
  • Progress updates: 22 updates