日本のドルマンセーター // japanese dolman sweater
Hibernating
Progress
75%
March 25, 2021
no date set

日本のドルマンセーター // japanese dolman sweater

Project info
218w-01 Dolman Sweater by Pierrot (Gosyo Co., Ltd)
Knitting
SweaterPullover
Needles & yarn
US 9 - 5.5 mm
US 10½ - 6.5 mm
7.0 mm
Sweet Fiber Yarns Canadian
2288 yards in stash
0 skeins = 0.0 yards (0.0 meters), 0 grams
Natural/Undyed
Notes

big love FilipaMLlink text

77x2 = 154

Take II

  • long-tail tubular cast-on, slip knot then first st a purl. slip knot to be knit w last st of round
  • work in the round to underarms
  • twisted rib (work first set-up row as per normal, twist knit sts on second set-up row)
  • Make it a medallion longer
  • BEFORE CASTING ON FOR UNDERARMS, CHECK FIT!!
  • 41st crochet cast-ons or use invisible double-sided provisional cast on from letho for sleeves?
  • work two sets of short rows into third medallion on front
  • Not sure why the ‘knot’ row on right wrist is offset by two rows from the rest of the chart. I worked all knot sts on same row across chart
  • cast off neckline on next knit row after first double decr in fourth medallion.
  • don’t use sloped bind off bc can’t crochet together nicely. Use short rows instead

take I

  • long-tail tubular cast-on
  • twisted rib (work first set-up row as per normal, twist knit sts on second set-up row)
  • 41st crochet cast-ons
  • Sloped bind off as per brooklyn tweed freja. Need to cast off 8 stitches in place of 7 on 4 occasions per side to compensate for extra cast on sleeve stitches
  • worked two sets of short rows into second medallion on front
  • Not sure why the ‘knot’ row on right wrist is offset by two rows from the rest of the chart. I worked all knot sts on same row across chart

sloped bind off as per freja (BT)
Step 1: Work the first bind off rows at the garment edges as usual.
Step 2: One row before the next bind off row, work to the last stitch of the row, turn.
Step 3: Slip the first stitch from the L needle purlwise, pass the unworked stitch of the previous row over the slipped stitch (the first stitch is bound off). Bind off the remaining stitches as
usual.

13 may - ouch, frogged it.
12 May - the hard truth; it doesn’t fit. Too tight, too short.
9 apr - finished front
6 apr - have cast off neckline on next knit row after first double decr in third medallion. Finished and cast off upper right front/arm.
5 apr - have nigh finished the second of the three front medallions. Worked on two sets of short rows, so front is 4 rows longer at centre front than back. I think they’re worked really well!
3 apr - cast off back. Whoopeee! It’s looking good. knit front until end of the ball which was fortunately before the point at which i was considering short rows for the bust. washed finished back and in-progress front. drying now.
1 apr - cast on for sleeves using crochet chain method, 41ch.
30 mar - both back and front on same needle now. Completed row 31 of chart.
28 mar - seamed ribbing, happy with fit! Have knit 19 rows of body on both sides.
27 mar - finished ribbing for side 2
26 mar - worked first underarm incr row.
25 mar 2021 - long-tail tubular cast on 5.5mm needles, 77 sts. First st is a purl to line up with knit columns in lace. Twisted rib. (Not at all sure why the pattern would have you pick up the ribbing later and knit down)
5 mar 21 - swatched centre lace motif on 5.5mm

viewed 96 times
Hibernating
Progress
75%
March 25, 2021
no date set
 
About this pattern
19 projects, in 150 queues
yarncycle's overall rating
yarncycle's clarity rating
yarncycle's difficulty rating
About this yarn
by Sweet Fiber Yarns
Aran
100% Wool
208 yards / 100 grams

121 projects

stashed 111 times

yarncycle's star rating
  • Originally queued: March 13, 2021
  • Project created: March 24, 2021
  • Hibernating: May 16, 2021
  • Updated: April 21, 2024
  • Progress updates: 2 updates