Myrtle
Finished
March 21, 2018
August 20, 2019

Myrtle

Project info
Myrtle by Kate Davies Designs
Knitting
SweaterPullover
me!
2
Needles & yarn
US 1½ - 2.5 mm
US 2 - 2.75 mm
32 stitches and 40 rows = 4 inches
in horsehoe lace pattern
5 skeins
Isager Yarn Spinni
1 skein = 328.1 yards (300.0 meters), 50 grams
471129
Blue-green
Loop in London, Greater London
Isager Yarn Spinni
1 skein = 50 grams
2 S
2905
Gray
Loop in London, Greater London
Isager Yarn Spinni
1 skein = 50 grams
470316
Gray
Loop in London, Greater London
Isager Yarn Spinni
2 skeins = 100 grams
101
471006
Blue-green
Loop in London, Greater London
Notes

03-21-2018

  • Swatched in the round and flat - gauge achieved with 2.75 for lace and 2.5 for ribbing.

  • K3togtbl worked as one stitch in circular swatch and as slip 2 purlwise, knit 1 through back loop, pass two slipped stitches over in flat swatch. The substitute looks the same to me, and is much easier and fluid to work, so I’ll be using this alternative in the sweater.

03-22-2018

04-06-2018

First chart rep complete.

02-07-2019

After a long long break on this, I dug it out a couple of weeks ago and am now working on it on at least one day a week (Mondays). Progress will be slow but at least it should be consistent!

02-28-2019

So I’ve discovered I’m not really capable of working on a project just one day a week, and this has ending up being my main project since I picked it up again a few weeks back. I want to keep working on it and have nominated it to be my wip for the kate-kal.

Have almost (but not quite) reached the armhole divide. Feels like real progress at last!

04-04-2019

I’ve not been very good at updating this project page. I’ve been knitting on this daily (although not for very long) since the start of the Kate kal and I’m now a couple of centimetres from the top of the back section. One nice thing about restricting myself to just this project is no longer needing to consult the chart, which makes me more inclined to pick it up in random moments.

April 4, 2019

Completed back, moved stitches to waste yarn, picked up front stitches.

April 15, 2019

Working neck.

April 20, 2019

Working neckband.

April 24, 2019

Starting first sleeve. Picked up stitches using a 2.25mm needle to make it easier - but this was a mistake as the join is too tight. For the next sleeve I’ll use 2.5 or gauge-size (2.75mm).

Picked up more stitches than the stated in pattern and decreased on next rnd.

June 1, 2019

Knitting that sleeve took ages! I finished the lace on May 24 - so a full month after starting it - and then took a week off to work on Birlinn.

Now knitting the rib cuff.

viewed 711 times | helped 7 people
Finished
March 21, 2018
August 20, 2019
 
About this pattern
193 projects, in 492 queues
KnitsByNight's overall rating
KnitsByNight's clarity rating
KnitsByNight's difficulty rating
About this yarn
by Isager Yarn
Lace
100% Icelandic
328 yards / 50 grams

5025 projects

stashed 5118 times

KnitsByNight's star rating
  • Project created: March 15, 2018
  • Finished: August 21, 2019
  • Updated: August 22, 2019