dark materials
Finished
October 12, 2018
November 10, 2018

dark materials

Project info
Layla by Elizabeth Smith
Knitting
SweaterCardigan
me me me
Needles & yarn
US 5 - 3.75 mm
21 stitches and 30 rows = 4 inches
in stocking stitch
1,069 yards
Rowan Kidsilk Haze
119 yards in stash
0.48 skeins = 109.7 yards (100.3 meters), 12 grams
4356
Craftee Cottage in Huntingdale, Victoria
October 11, 2018
Shilasdair Luxury DK w/Camel
145 yards in stash
0.56 skeins = 184.8 yards (169.0 meters), 28 grams
329
Purple
Sunspun
September 3, 2016
Stone Wool Romney + Merino
950 yards in stash
2.8 skeins = 700.0 yards (640.1 meters), 280 grams
Natural/Undyed
January 2018
Uist Wool Conntraigh DK
182 yards in stash
0.29 skeins = 74.6 yards (68.2 meters), 29 grams
Natural/Undyed
present from Glenda!
June 14, 2018
Notes

total weight 436gm
layla vest/cardigan, knit in dk weight. Diagonal underarm shaping. no stripes, boho jacket mosaic colourwork.

Kidsilk haze in dewberry to strand w the shilasdair.

Stone wool gauge is 30 rows
Row gauge for mosaic is 36 rows.

Garter stitch gauge 20sts

hem - 6.5cm is 14 garter ridges.

Dividing for front and back - work to marker, M1R, k2, turn (leaving the rest of the sts on the needle); p to end. Rpt these two rows in MC five times. Total of 6 sts increased in MC, 58 sts for right front. Work two more incr rows, one each in CC1 and CC2. 2 incrs, 60 sts.
then, work a kfb at each end of the next row to accommodate the colourwork chart. so actually, 62sts.

Front neck shaping - on right front work as p2tog placed one st before end of row

  • on left front work as ssp? p2togtbl?
  • work first decr on row 46 of chart (WS)
  • work a decr every 4th row, 10 more times (now 11 decrs)
  • work 5 rows, then decr on 6th (12 decrs total)

shoulder shaping - every other row
- start on row 67 or 68 depending on which side
cast off progression is:
3sts x 3
4sts x 1
3sts x 8
4sts x 2
5sts x 1

Sleeve bands - decr 2 sts on 10th and 12th rows. Cast off pwise after row 12.

Front bands - picked up 137 - 30 - 137 (304 altogether).

9 nov - 11 garter ridges. Have.to.get.this.done.
7 nov - have knit 7 garter ridges for neck bnd. 7 to go!
6 nov - yay, got all the sts picked up for the front band and knit a row. Yet to actually count how many sts but possibly two hundred odd. (actually 304)
5 nov - finished other cuff.
3 nov - finished left front (for the second time). All seamed and ends woven in. Just one more cuff and collar to go!
31 oct - on row 10 of sleeve band: k1, k2tog, k to three sts before end, ssk, k1.
30 oct - finished left front!!
29 oct - sigh, finished the lower band again. Decided to try and match the neap-tide gradient to that on the right front.
28 oct - finished back and seamed right shoulder. neap tide 70gm; ksh 16gm; shilasdair 70gm. Finished lower band on left front.
26 oct - finished row 38 of pattern on back. so yay, half way!
22 oct - after completing right front, shilasdair 84gm, ksh 20gm, neap tide 85gm.
21 oct - 72 rows st st, will now divide. Shilasdair 91gm, KSH 25gm, neap tide 92gm. Row gauge is difft over mosaic knitting. I have recharted it but current plan is to knit to 12cm (where neck shaping starts) and reassess!
18 oct - soaked this for a while today, then gave it some good tugging to even out the sts. Just as I thought, 30 rows/10cm. 60 rows done. The washed fabric is just divine. Finished that partial ball and started a new skein.
17 oct - need to do a steam block but looks like 30 rows per 10cm. 52 rows st st done, measures 25cm. Yay, I knit the end of the skein today, which I had been aiming for, and joined in a partial ball which I think I’ll get through quite quickly.
15 oct - 10 st st rows, measures about 3cm.
14 oct - 14 garter ridges done. Moving on to st st section. Who-hoo, six rows of st st. These are long rows. Curious to see what row gauge turns out to be.
13 oct - 7 garter ridges is 3.5cm
12 oct - cast on, yay. 222 sts.

viewed 356 times | helped 2 people
Finished
October 12, 2018
November 10, 2018
 
About this pattern
102 projects, in 378 queues
yarncycle's overall rating
yarncycle's clarity rating
yarncycle's difficulty rating
About this yarn
by Rowan
Lace
70% Mohair, 30% Silk
229 yards / 25 grams

52430 projects

stashed 43817 times

yarncycle's star rating
About this yarn
by Shilasdair
DK
40% Angora, 40% Wool, 10% Cashmere goat, 10% Camel
330 yards / 100 grams

899 projects

stashed 961 times

yarncycle's star rating
About this yarn
by Uist Wool
DK
50% Cheviot, 50% Hebridean
257 yards / 100 grams

59 projects

stashed 46 times

yarncycle's star rating
About this yarn
by Stone Wool
DK
60% Merino, 40% Romney
250 yards / 100 grams

191 projects

stashed 155 times

yarncycle's star rating
  • Originally queued: September 16, 2018
  • Project created: October 1, 2018
  • Finished: November 10, 2018
  • Updated: April 26, 2020
  • Progress updates: 5 updates